Loading…
Loading…
10,526 live6,886 closing this weekmost from PWD and Public Works Department
10,526 results • Latest
Repair of potholes and patches on Village Roads in Miyaganj Block
Repair of potholes and patches on Village Roads in Fatehpur Chaurasi Block
Repair of potholes and patches on Village Roads in Safipur Block
Repair of potholes and patches on Village Roads in Bangermau Block
Repair of potholes and patches on Village Roads in Ganjmuradabad Block
Construction of Vishwnathpur Mandir to Rangila Chauraha Link Road under CMGSY Yojana with 05 year Maintenance Lot No 15 of 15
Construction of Sonkatiya Ramanand Ghar to Chhattha Pokhari via Motirajbhar Barauli via Shamshanghat Link Road under CMGSY Yojana with 05 year Maintenance Lot No 14 of 15
Construction of Gram Amahawa Chauraha to Pandey Dukan and Van Vibhag Chauki Link Road under CMGSY Yojana with 05 year Maintenance Lot No 10 of 15
Construction of Pakadiyar Vishupur School via Kotiya Link Road under CMGSY Yojana with 05 year Maintenance Lot No 13 of 15
Reconsturction of Ghughuli Shikarpur road to Ambedkar Gram Amoda Link road with 5 year Maintenance Lot no 1 of 1
Construction of Mukhyamantri Kampojeet Vidhalay Medanipur aprroch Link Road under CMGSY Yojana with 05 year Maintenance Lot No 12 of 15
Construction of Krit Pipara to Khem Pipara Link Road under CMGSY Yojana with 05 year Maintenance Lot No 7 of 15
Construction of Vikash Khand Nichlaul Baidauli- Ram Prasad Maurya Ghar to Katan Tola Link Road under CMGSY Yojana with 05 year Maintenance Lot No 2 of 15
Construction of Gidaha to Prathmik Vidhayalay Fulwariya Link Road under CMGSY Yojana with 05 year Maintenance Lot No 8 of 15
Construction of Kota to Banspar Dihuliya Chhokharaj Public School to Maharajganj Farenda Mai Road Link Road under CMGSY Yojana with 05 year Maintenance Lot No 9 of 15
Construction of Vikash Khand Ghughuli -Rampur Baldeela to Vishunpur Gadadua Paratawal Puraina Main Road Link Road under CMGSY Yojana with 05 year Maintenance Lot No 11 of 15
Construction of Siswa Hawati Road to Karmahi Nahar Patari pul to Shitalapur Link Road under CMGSY Yojana with 05 year Maintenance Lot No 4 of 15
Construction of Vikash Khand Nichlaul Gram Obari to Bali Link Road under CMGSY Yojana with 05 year Maintenance Lot No 3 of 15
Construction of Vikash Khand Siswa- Barawa Pakari Siswa Gerama Road Nahar pich to Kishan Inter Collage Belawa Link Road under CMGSY Yojana with 05 year Maintenance Lot No 1 of 15
Construction of Harpur Kala to Barohiya Link Road under CMGSY Yojana with 05 year Maintenance Lot No 5 of 15
Construction of Vikash Khand Mithura Deoria Branch to Harkhoda Link Road under CMGSY Yojana with 05 year Maintenance Lot No 6 of 15
as per boq
as per boq
as per boq
as per boq
ARCHERY AND GYMANASTIC HALL EQUPMENTS AT KANYA
B.T. Renewal of Kawardha Raveli Pratappur Road Length 19.80 K.M. at Distt.- Kawardha (C.G.)
STRENTHENING AND UPGRADATION WORK OF SYAHI-SANAWAL ROAD, LENGTH K.M. 1 TO 9, 13 TO 18 AND 23 TO 35 = 28.00 K.M. i/c CULVERT DIST.- BALRAMPUR-RAMANUJGANJ (Work code – W31658)
STRENGTHENING AND UPGRADITION WORK OF RAMANUJGANJ-WADRAFNAGAR ROAD LENGTH K.M. 6 TO 21 AND 28 TO 54/6 = 43.60 K.M. , DISTT.- BALRAMPUR-RAMANUJGANJ (C.G.) (Work code – W31661)
WIDENING & STRENGTHNING OF SHYAM NAGAR-DEORI ROAD( VILLAGE ROAD NO.16),LENGTH 6.25 KM. I/C. CULVERTS AT DISTT. GARIYABAND ( GARIYABAND DN.).
Annual Maintenance to Arabhavi-Challakere (SH-45) to Mabanur-Madlur-Jalikatti road from Km. 0.00 to 6.80 and Arabhavi-Challakere (SH-45) to join Gorabal road from Km. 0.00 to 2.80 in Savadatti Yallamma Constituency of Belagavi Dist under HoA 3054 MDR Maintenance for the year 2026-2027
Annual Maintenance for the year 2026 27 of Hireulligeri Chikkulligeri Road from Km 0.000 to 1.900 Inam Hongal Nanagundikoppa Road from Km 0.000 to 1.900 and Betsur Gummagol Road from Km 0.000 to 4.100 in Savadatti Taluk Belagavi District
Annual Maintenance of Somapur-Naduvinadaddi Road from Km. 0.00 to 6.00 and Nugganatti-Aladakatti Road from Km. 0.00 to 5.50 in Savadatti Taluk
Annual Maintenance of Jalikatti-Somapur-Tallur-Aaladakatti Road from Km. 0.00 to 7.90 and from Km. 8.25 to 13.55 in Savadatti Taluk
Emergent rain damage patch repairing work of different stretches at Kalipahari-Tirat (FR-17) road from 1.50km. to 3.00km. by providing patching potholes, repairing potholes and 20mm premised carpeting work
Emergent repairing and maintenance work of Durgapur Station Link Road from 0.00km. to 0.300km and 0.700km. to 0.950km. in stretches of Durgapur Highway Sub-Division
Emergent repairing and maintenance work of Raghunathpur-Kantaberia Road via Molandigh from 12.00 km to 13.80 km, and 16.50 km to 19.00 km in stretches of Durgapur Highway Sub-Division under Asansol Highway Division,
Emergent repairing and maintenance work of Muchipara-Shibpur road via Molandighi from 3.50km to 7.50km. and 9.50km. to 14.00km, in stretches of Durgapur Highway Sub-Division under Asansol Highway Division
New Construction work of Aligarh Bypass Road to Tajpur Rasoolpur Village Via Gagan Inter Collage
Annual Maintenance Estimate of Electrical Installation of whole system at Bijan Bhawan Salt Lake Kolkata-- Repairing Addition Alteration of EI Works as and when required
Emergent Servicing and Repairing of 33/0.415KV Sub-Station mainly the 33kv HT Panel complete overhauling, Supply and connecting 33 KV HT cable at Aliah University Campus, Newtown, Rajarhat, Kolkata-700160
Chakberia Bhojerhat via Tardah Road, from 4.55 km to 10.69 km, emergent rain damage patch repairing work in different stretches under South 24 Parganas Highway Division in the District of South 24 Parganas.
Pot Holes and Patch Repair of SH-MDR-ODR Roads in Tahsil Hasanganj
New Construction work of Naurangabad Chhawni Shahwajpur Road to Ishanpur Road
Pot Holes and Patch Repair of SH-MDR-ODR Roads in Tahsil Bangermau
Civil work for installation of two nos. Lift No. 7 and Lift No. 8 Lifts at Block-B of New Secretariat Building during the year 2026-27
Anandapur(Ruby) to Natunhat Road via Kheadah-Boynala Pratapnagar-Harapur Road, from 5.00 km to 7.00 km,12.00 km to 15.00 km emergent rain damage patch repairing work in different stretches under South 24 Parganas Highway Division.
New Construction work of Rohina Singhpur to Balukheda Via Asgarpur
Saltora-Murulia Road from 0.00 km to 12.70 km, Strengthening work including 4 nos. CD Structures, 600 mtr. Boulder Sausage and 500 mtr. Drain under Bankura Highway Division in the District of Bankura under RIDF-XXXII.
Construction of Alawalpur to Khaliveer Baba Hata Mandir link road with Five Year Maintenance