Loading…
Loading…
885 results • Latest
Layer 2 Access Switch (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Solid Cushion Tyres (V3) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
OPENABLE FIXED WINDOW FOR LHB AC COACHES, as per Drawing: BZE54020 TO PL NO-33694874.
COVERING COMPATIBLE TO EMERGENCY PULL BOX OF M/S KNORR BREMSE MAKE,
SILVER SULFADIAZINE AND CHLORHEXIDINE GLUCONATE CREAM 20GMS
PROCUREMENT OF DOUBLE FERRULE ITEM FOR LHB COACHES
Live Working Gloves of Insulating Material (V2) ISI marked to IS 13774 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
STAINLESS STEEL WIRE 1.0MM DIAMETER IN SPOOL OF WEIGHT 12.5(APPROX.)
These spares mentioned are required for the upkeep of the pipeline network in case of any leakage / Damage.
LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Sulphuric Acid (V2) Conforming to IS 266 (Q3) (3 (3 ))
HRC Fuse as per IS 13703 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Modular Table/Meeting Table/Centre Table (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6351148 Dated : 30-07-2025 Bid Document 1/6 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
RFH SOLUTIONS PVT. LTD. 3 - seater Sofa Set with One Single, RFH SOLUTIONS PVT. LTD. 3 - seater Sofa Set with One Single Seater Unit Secondary Unit
Duck Back Raint Suit and rain coat included componenets Rain, Duck Back Raint Suit and rain coat included componenets Rain Suit Set of size XXL
PB Pearl Bags Raint Suit and rain coat included componenets, PB Pearl Bags Raint Suit and rain coat included componenets Rain Suit Set of size S
Degreasing Agent, Activation Agent, Phosphating Agent & Toner
SUPPLY, INSTALLATION & COMMISSIONING OF FIRE DETECTION CUM SUPPRESSION SYSTEM (FDSS) IN TOILET OF AC 3 TIER COACHES.
Elecric Bells and Accessories as per IS 2268 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6861646 Dated : 10-11-2025 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
E-cart for Goods (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
RFH SOLUTIONS PVT. LTD. Mid-back Chair With Fixed armrest, RFH SOLUTIONS PVT. LTD. Mid-back Chair With Fixed armrest with Cushion
SPARES FOR CNC BOGIE MANUFACTURING MACHINE (ADORE/STAKO PLASMA).
CABLE JOCKEY MINI DUCT RODDER Drg : Similar to part no 100499, M/s Stanley or any other approved make
Tractors (V1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Set of Shell Item for HS SPART Supervisor Van coach.
TEE REDUCING 1" X 1/2" X 1" B1.
SET OF ROOF ARCH COMPLETE FOR AMRIT BHARAT NON AC HOT BUFFET COACHES
Rough leather Tool kit bag for Electrical maintenance Staff as per drawing No.RCF/EL/MTC/TKB DT.10/12/2025.SAMPLE APPROVAL FROM CONSIGNEE BEFORE BULK SUPPLY.
LEVOCARNITINE 150 MG AND VITAMIN E 200 MG ORAL TABLET
ANTI-HEAMORRHOIDAL CREAM CONTAINING BECLOMETHASONE DIPROPIONATE PHENYLEPHRINE AND LIGNOCAINE CREAM
GABAPENTIN 100 MG + METHYLCOBALAMINE 500 MG TABLET
CONTACTOR 3 POLE, 25 AMP. Drg:COIL - 220 [CONTACTOR 3 POLE, 25 AMP. Drg:COIL - 220 VOLT AC , VOLT WITH 2 NO + 2 NC.]