Loading…
Loading…
287 results • Latest
(1) KVR: S&T works in c/w Proposed New station building.(2) GVN: Improvements to water supply system duly providing 1.0 lakh Liters RCC tank GVN under ADEN/RJY sub division. (3) GVN & PAP:Signalling works in c/w Improvements to parking sheds in circulating area under ADEN/RJY sub-division. (4) Godavari Pushkarams: 2027 Arrangements at Kovvur station : Signalling works in c/w Augmentation of water Supply/Storage System and Improvements to platform surfaces (PF Nos 1,2,3) and and Arragements at Godavari station: Improvements to circulating area, Platform surface (PF Nos 1 & 2) and Improvemenmts to Arrangements of Officers, Supervisors and staff on account of Pushkarams. (5)Development of New platform (PF No.6) on the other side of station at RJY and Improvements to Road surfaces of level crossings, RUBs and LHSs in the vicinity of purshkaram handiling stations (GVN, KVR & RJY). (6) GVN: Provision of 2nd Foot over bridge with 6 m wide at Godavari station. (7) KVR: Provision of 2nd Foot over bridge with 6 m wide at Kovvur station. 8.Godavari Pushkaram-2027 Permanent and tempory arragngements for holding Area. Toilets, Watering arragements at Kovvur, Godavari and Rajahmundry stations. (9) Proposed replacement with PSC slabe (post tensioned) for steel Girder Br No.13 Up ( 3 x 12.20 ) & 13 Dn (3 x12.20 m) in ADEN/EE sub division. (10) S&T works in c/w Rebuilding of existing Br No.682 Up & Dn with RCC Boxes by open cut Method in SSE/W/BPP section and (11) costruction foot over bridge (FOB) 3m wide withramp on both sides at Km 28/9- 29/0 at Narsapur station. (12) Proposed construction of Limited Height Subway (1 x 6.0 m x 0.25 m) at Km 743/5-7 respassing location at Satyanarayanpurm between BVM-AKPstations (13) Proposed construction of Limited Height Subway (1 x 6.0 m x 0.25 m) at Km 755/5-7 respassing location at Lankelapalem between THY-DVD stations. (14) RJY: Construction of two tower car sheds for BZA and RJY depots and (15) BZA two tower car sheds for BZA and RJY Depots.
Replacement of 6 Quad Cables Against Faulty Patches in Various Sections of Khurda Road Division and Replacement of Overaged Batteries, Battery Chargers & UPS Systems.
Vijayawada Division: Signal and Telecom Department: S&T works in connection with (1)BZA-VSKP section - Prposed construction of ROB in lieu of LC No.316 at Km 434/20-22 at Gunadala station yard., (2) KI-BZA section - Proposed construction of ROB in lieu of LC No.147 at Km 573/17-19 between Kondapalli-Rayanapadu stations. (3) BZA-KI section - Prposed construction of ROB in lieu of LC No.148 at Km 575/9-11 at Rayanapadu station yard. (4) BZA-VSKP section - Prposed construction of ROB in lieu of LC No.404 at Km 589/12-14 at Kadiyam station yard. (5) BZA-VSKP section - Prposed construction of ROB in lieu of LC No.407 at Km 593/32-34 between Kadiyam-Dwarapudi stations. (6) BZA-VSKP section - Prposed construction of ROB in lieu of LC No.409 at Km 597/17-19 at Dwarapudi station yard. (7) BZA-VSKP section - Prposed construction of ROB in lieu of LC No.415 at Km 605/9-11 between Anaparthi-Bikkavolu stations. (8) BZA-VSKP section - Prposed construction of ROB in lieu of LC No.355 at Km 501/22-24 between Denduluru-Bhimadolu stations. (9) BZA-VSKP section - Prposed construction of ROB in lieu of LC No.363B at Km 514/8-10 at Pulla station yard. (10) BZA-VSKP section - Prposed construction of ROB in lieu of LC No.378 at Km 544/03-05 at Navabpalem station yard. (11) Proposed Construction of ROB in lieu of LC.16 at Km.15/4-5 between Nidamanuru and uppuluru stations. (12) Proposed Construction of ROB in lieu of LC.328A at Km.458/32-34 between Peddavutapalle-Telaprolu stations. (13) Proposed Construction of ROB in lieu of LC.324 at Km.452/31-33 at Peddavutupalle station yard. (14) Proposed Construction of ROB in lieu of LC.422 at Km.619/20-22 at Medapadu station yard. (15) Proposed Construction of ROB in lieu of LC.439 at Km.658/18-20 at Ravikampadu station yard. (16) Prposed construction of ROB in lieu of LC No.426 at Km 629/00-02 at Samalkot Jn. station yard.
Signalling work in connection with BCM work with Geogrid and Geo-Textile method (TFTR & TBR) in Solapur Division of Central Railway.
Protection/shifting of S&T cables/gears in connection with execution of ROB/RUB/Subway works in Miraj-Latur Road Section of Solapur division on Central Railway.
S&T works in connection with development of Goods Sheds at Tajsultanpur and Dharashiv stations of Solapur Division.