Loading…
Loading…
287 results • Latest
Laying of OFC and 6 quad in SHC-SRGR, SKI-JYG section and Provision of alternate communication in JYG- KJI-KHTN AND BHGJ-,MRIJ station of SPJ division
S&T Work: (i)Utility shifting of LC Gate No. 158 (JDR-BMKI) in connection with the work " Construction of ROB at LC No.- 158 between Jivdhara -Motihari in East Champaran District. (ii) Utility shifting of LC Gate No. 178 (SGL-MJL) in connection with the work " Construction of ROB at LC No.- 178 between Sagauli Majhaulia in West Champaran. (iii)Utility shifting of LC Gate No. 160 (BMKI Yard) in connection with the work " Construction of ROB at LC No.- 160 at Bapudham Motihari yard in East Champaran.
DESIGN, PROGRAMMING, INSTALLATION, SUPPLY, TESTING AND COMMISSIONING OF BANSGAON STATION, PIPRAULI STATION, KHAJANI STATION & UNWAL STATION ELECTRONIC INTERLOCKING (EI) SYSTEM (CENTRALIZED TYPE) CONFORMING TO RDSO/SPN/192/2019 VER.2 OR LATEST (WITH LATEST AMENDMENT IF ANY) FOR PIPRAULI, KHAJANI, UNWAL AND BANSGAON STATIONS, AS PER SIP ALONG WITH INDOOR & OUTDOOR WORK AND TELECOM WORK IN SAHJANWA -BANSGAON SECTION (INCLUDING MAGHAR-PIPRAULI Y-CONNECTION) INCLUDING PART SUPPLY OF MATERIALS AT SAHJANWA - BANSGAON NEW LINE SECTION OF SAHJANWA- DOHRIGHAT NEW LINE OF LJN/BSB DIVISION OF N.E.RAILWAY .
S&T work in connection with: Provision of Model Room in MDZTI/BSP.
a) S&T work for provision of additional loop lines at Parmalkasa and Gangajhari stations (EI stations) of Nagpur Division SECR, b) Replacement of VDU along with embedded PC over Nagpur division of SECR.
Rajkot division-S&T Work in connection with (i) Providing ROB in lieu of LC No 135 at Km 755/0-1 Between KHDI - PDH section(2 lanes) (ii) Providing ROB in lieu of LC No 147 at Km 770/1-2 Between PDH - CX section(2 lanes) (iii) Proposed LHS in lieu of LC No. 92 at Km 698/1-2 bet LXR-WKR (iv) Kanalus: Rectification of bad layout from Pt 112 towards PBR side by shifting the turnout by 18m towards RJT.