Loading…
Loading…
533 results • Recent activity
Replacement of Gaskets of 40MVA Transformer-I (ABB make) and other associated works at 220KV Substation Dohna under E.T.D.-II Bareilly
Replacement of 33KV Main Bus by changing the Single Moose Conductor with Double Moose Conductor alonghwih associated Materials and other associated works at 132KV Substation Aonla under E.T.D., Budaun
Replacement of 33KV Main Bus by changing the Single Moose Conductor with Double Moose Conductor alonghwih associated Materials and other associated works at 132KV Substation Bisauli under E.T.D., Budaun
Monthly Routine/Emergency Patrolling and periodic Cutting of trees in Line corridor and routine general/normal preventive and Breakdown maintenance of various 132KV Transmission Lines under E.T.D.-II, Bareilly during the Period of 1 Year
Monthly Routine/Emergency Patrolling and periodic Cutting of trees in Line corridor and routine general/normal preventive and Breakdown maintenance of various 220KV Transmission Lines under E.T.D.-II, Bareilly during the Period of 1 Year
Construction of 132 KV S.C. Pilibhit-Pilibhit TSS 2 Phase Transmission O/H Line on D.C. Towers on Turnkey basis alongwith materials and other associated works under E.T.D.-II, Bareilly