Loading…
Loading…
533 results • Recent activity
Preventive, Routine and General/Normal Breakdown Maintenance and Providing Assistance in Operational Work alongwith associated Works at 132KV Sub Station Richha under E.T.D., Bareilly during the Period of 1 Year w.e.f. 01.07.2019 to 30.06.2020
Improvement AND Strengthening of Lighting Arrangement by Installation of 30 Meter High Lighting Mast alongwith other associated Works at 220/132KV Sub Station Pilibhit under E.T.D. - II, Bareilly
Construction of 132KV S.C. Pooran Pur - Pooran Pur TSS Line on D.C. Towers alongwith other associated Works under E.T.D. - II, Bareilly
Regular Operation, Checking, Servicing and Minor Maintenance of Mulsifire System and Hydrant System Installed at 220KV Substation Budaun under ETD, Budaun alongwith other associated Works during the Period of 11 Months w.e.f. 01.07.2019 to 31.05.2020
Replacement of 20MVA Transformer by 40MVA Transformer alongwith other associated Works at 132KV S/S Bilsi including Loading of 40MVA T/F at 132KV S/S/ Bisauli, its Carriage from Bisauli to Bilsi and Unloading at 132KV S/S Bilsi under ETD, Budaun
Preventive, Routine and General/Normal Breakdown Maintenance and Providing Assistance in Operational Work alongwith associated Works at 220KV Sub Station C.B. Ganj under E.T.D., Bareilly during the Period of 1 Year w.e.f. 01.07.2019 to 30.06.2020