Clearance of snow in stairs area at Holy Cave.
Clearance of snow in hutment area at Holy Cave
Clearance of snow in Base Hospital area at Lower Holy Cave
Repair /Installation of available Overhead Sign BoardS at Nunwan 01 no Chandanwari 01 No,and 03 nos for pissutop, zojibal, and at Sheshnag Camp .
Repair to existing fencing including repair of gates and other structures at Nunwan Camp.
Erection of fencing around Medical Camps by way of providing M.S. angle posts and Agronet from Chandanwari to MG Top and zojibal administrative Camp site .
Creation of space for instillation of additional toilets by RDD , by way Retaining walls and Filling of depressions / undulations at different spots inside Nunwan camp.
Engagement of sanitation workers for upkeeping of yatra camps before deployment of RDD sanitation workers along pahalgam axis for yatra 2026.
Emptying of solid waste Collection tanks of STP by way of removal of sludge coming from Toilets and attach Baths of Huts by way of engaging of sucker including its disposal up to appropriate site. before Yatra 2026 at Nunwan Base Camp.
Strengthen of Prefab Huts at upper Camps i.e Sheshnag, ZOJIBAL, and chandanwari etc.
upkeeping of prefabricated hut at Zojibal including its minor repairs to make it fit for accommodation of Camp directors and staff deputed for yatra duty .
Construction of Dry masonry soakage pits for attached washrooms of Administrative and Outsourced huts at Sheshnag .
Providing and fixing of sanitary fitting to attached baths of Adm. Huts, outsourced Huts and minor repairs to attached bathrooms of existing hut rooms at Sheshnag Camp (23 Rooms).
Supply and installation of steamer run by fire wood with complete water supply fitting for providing hot water facility to administrative huts at Nunwan Camp.
Repairs to Existing Sadhu sheds 07 nos including Restoration of Damaged Flooring and Painting etc.including Repair to Cloak Rooms 02 nos with Paintings incl. and Other Spots at Nunwan camp
Upgradation/ Repair of Existing PPGI Sheeted Huts by way of providing of wall lining including improvements to damaged Washrooms at Nunwan Base Camp .
Upgradation/ Repair of Existing Prefab Huts ,Outsource blocks ,Dormitory type sheds and other structures for Accommodating yatries at Nunwan Camp
Cleaning of Oil and Grease Tank by way of removal of langar Solid waste and its Disposal up to Appropriate site and upgradation / Repairs of Oil and Grease Tank at Nunwan Camp .
Covering of Toilets areas by way of installation of Agronet fencing along Pahalgam Axis .
Painting, of Toilets and baths along Pahalgam Axis .
Upgradation / Repairs and Augmentation of main Sewerlines (Toilet Sewer line and langar Disposal line) by way of providing and laying of Pipes 200 mm ,150mm and 100 mm Dia with construction of Regular manholes at Nunwan Camp.
Minor Repairs to Existing Pacca Toilets 6 Blocks comparising of 64 toilets units and existing prefab toilets and Baths 311 nos with repair its sewage disposal line and sanitary items including Europeon type arrangement Complete at Nunwan Base Camp.
Departure Lounge, temporary rooms including fitting and repairs to G.I chain link fencing at Neelgrath (6 rooms) , Huts for Camp Director / Medical / Newly constructed PUF Huts at Baltal(10 Nos.).
Repair to Outsourced Huts at Baltal (33-64).
Construction of new rooms for staff at Baltal .
Sanitation workers for Camp Cleaning, Cleaning of Administrative Huts, Toilets etc before the arrival of RDD workers at all Lower and Upper Camps along Baltal Axis.
Rooms and platform for Ayush at Base Hospital Baltal
Repairs to Domail camp including dismantling and re-erection of rooms for medical and other departments.
Repairs to Base Hospital and fixing of CGI sheet roofing
Repairs to Administration and Outsourced Huts (81-92, 93-104, 1A-8A, M/Hall, Kitchen, Dining) and departmental accommodations.
Repairs and installation of existing sign boards, flexes, vinyl before start of Yatra including dismantling and safe storage after culmination of Yatra.
Repair to Outsourced Huts at Baltal (65-80, stores)
Repair to Outsourced Huts at Baltal (1-32).
Improvement to old Pucca toilet blocks and repair to sewer line at Lower Camps along Baltal Axis.
Construction of paths between tentage sites and STP at Baltal including fencing of STP and stacking old.
Construction of New sheds at Baltal for JK Bank behind JPCR .
Upkeeping of Pucca Toilet units at Holy Cave and Lower Holy Cave
Construction of drains and foothpaths in tentage area at Panjtarni.
Construction of 01 No. Rest/ Rain shelter at Kalimata track.
Carriage and Installation of washbasin block of 02 units along Baltal axis
Augmentation of the Cloak Room no 1 and construction of additional 02 No. cloak rooms and Upgradation of area outside Shoe rack by way of supply of additional racks, construction of sitting benches and pucca platform at Holy Cave and Lower Holy Cave.
Plastering, pointing and painting of stone masonry walling,meeting hall painting including repairs to the stairs and erection of railing to improve the ambiance at Holy Cave before Yatra and dismantling of the railing after Yatra
Plastering and painting of 02 Nos. stores at Holy cave
Erection and repairs of the existing constructed rest shelters along Baltal axis and enroute from Sangam to Panjtarni including dismantling of the same after Yatra.
Carriage, assembling of Camp Director Hut and Addl/Deputy Camp Director with attached washroom before Yatra including cost of dismantling and strengthening after Yatra at Brarimarg and Sangam
Carriage and assembling of PPGI sheet 16 rooms of size 3.45 m x 3.45 m, Reserve Sheds( 03 Rooms) and RFID shed 01 room , Shops 03 nos., Cloak rooms 6 Nos. before yatra and dismantling and safe storage after Yatra at Holy Cave and Lower Holy Cave
Assembling of SASB Staff Huts, Base Hospital, Medical and Police Officers Hut, Meeting Hall, JK Bank Hut an CGI sheet sheds for BSNL, kitchen, shoe rack at Holy Cave before start of Yatra and its dismantling and safe stacking after conclusion of Yatr
Assembling of dismantled portion of Base Hospital including finishing works before Yatra including dismantling of the same and safe stacking after the culmination of Yatra at Lower Holy cave.
Renovation of damaged outsource rooms at Panjtarni.