Loading…
Loading…
900 live372 closing this weekmost from South Western Railway and Indian Railways
900 results • Latest
Earthing Cable Complete for LHB Type Coaches (having M-10 Stud Size to Table No.-1 of EDTS-200) Drg. No. LW-71248 Alt c. RCF specification No. EDTS-101, Rev C with Corrigendum 10, Amendment 3, Annexure 1
Annual maintenance contract including supply and installation of must change materials/spares and scheduled maintenance of Tower Wagons of Hubballi Division for the period of 2 years.
Pantograph Assembly complete for High Speed AC Locos with Motor Assembly
ANNUAL MAINTENANCE CONTRACT WITH M/S. KIRLOSKAR OIL ENGINES LIMITED, PUNE FOR REPAIR & MAINTENANCE OF HA694 ENGINES, DA16 LIGHTING GENERATORS & D8 WELDING GENERATORS OF SOUTH WESTERN RAILWAY
Integrating of Lifts, Escalators, 70%-30% Platform Lighting circuits, Pumps, Street light circuits, Substations & IoT devices with IR-NIYANTRAC Application over Mysuru Division.
Repairing/Overhauling of Deutz Engine Model No. BF6M1015CP, Serial No. 09206044 of Duomatic - 8154 Track Machine, S.W.R, Yeswanthpur
Compression type tubular terminal ends for Aluminium conductors of insulated cables to IS: 8309/93, Designation:CAA-120 NOTE: ISI Certified item with valid CML number only.
FLANGE MALE CONNECTOR( PIPE TO EQPT) 20 MM N.B (70 MM PITCH) TO DRG NO ICF/STD-3-5-020, ITEM-1, ALT c, AS PER ICF SPECIFICATION NO. ICF/MD/SPEC-166.
DRILL TWIST HSS FOR MORSE TAPER SHANK TWO PIECE CONSTRUCTION TYPE N 32 MM IS: 5103
Supply of 10 Pair 0.5 mm conductor dia and Supply of 20 Pair 0.5 mm conductor dia.
DBU-OHE modifications in connection with Provision of Emergency Dispatch cross over at YNK end for providing Universal R&D facility to all running lines and connectivity from Tower car Shed to existing shunting Neck including extension of existing neck from 440 to 600m.
Provision of Automatic signalling between WFD-JTJ section-TRD works.
[i] SBC-JTJ Section: Proposed construction of RUB at trespassing location at km 339/300-400 between HDIH-KJM stations in ADEN/SBC sub-division- TRD works[ii] SBC-JTJ Section: Proposed construction of Pedestrian subway at Km.230/000-100 between PU-MAR stations in ADEN/BWT Sub-division [iii]Recoupment of ballast at TSS,SP/SSP and provision of cable trench covers in SBC-JTJ Section.[iv]Bifurcation of elementary section at SKPT station and modification of umbrella structures at YPR station. [v]Provision of earthing and bonds at SSP/SP,FOB and Platform shelters in SBC-JTJ Section.[vi] KJM-Augmentation of KJM shed for increasing homing capacity from 175 to 300 Electric Locomotives-Detailed Estimate. [vii]OHE modifications in connection with Construction of new AC loco trip shed at YPR. [viii] YNK-BWT Section: Proposed an approach road on LH side in RUB 85A at Km 96/200-300 between CMY-SVS stations [ix] OHE modifications in connection with construction of AC Loco trip shed at SMVB.
OBHS and Related Service for Railways (New Version 2.0) - Linen Distribution; Not Applicable; Not Applicable; Not Applicable; Coach Hour
Interlocking of 15 Nos manned LC gates where TVUs >10000 over MYS division [excluding HMRDC section]
Replacement of old version of IPS with latest version at 10 Stations. (NTW, SHYP, HSD, RGI, S, MYS, MNGT, BLKR, DRU & ALUR).
Interlocking of 15 Nos. manned LC gates where TVUs >10000 over MYS division (excluding HMRDC section) LC No. 126 (ANF - SRF), 145 & 147 (SRF - TLGP), 124 & 125 (DRU - RRB), 1 (RRB - SPV), 121 (ANF - SRF), 84 (KMSI - ANF), 119 (BGPA - HHT), 35, 40, 43 & 50 (NTW - CMNR), 14 (BLGA - STE) and 61 (KTY - AVC).
CALIBRATION OF VARIOUS GAUGES, MEASURING INSTURMENTS AND TEST BENCHES AVAILABLE AT C&W DEPOTS OVER MYSURU DIVISION
Q-Series Neutral Line Relay(QN1 Type), 8F/8B, 24V DC complete with plug board (base plate)
Modification/Shifting of existing Electrical EHT/HT/LT Power line crossing and utility shifting in connection with various Railway projects under Construction Organization Hubballi Unit.
Arranging 182 KW Domestic Power Supply for staff quarters at Tumkur in Bangalore Division
FIRE RETARDANT UPHOLSTERY FOR LHB DESIGN AC CHAIR CAR SHATABDI COACH AND LHB DOUBLE DECKER COACH CONFIRMING TO RCF SPEC.NO-MDTS-44386-REV- NIL ISSUED BY RCF dt 20-02-2023 OR latest TO COMPLYING-EN 45545-2 or latest specification FIRE CHARACTERISTICS, COLOUR AND PATTERN SHOULD MATCH WITH AUNDE JACQUARD MOQUETTE AMPURIAS QUALITY AND CIRCUTTE VERDE OF M/S AUNDE SPAIN. NOTE- SAMPLE TO BE APPROVED BY CONSIGNEE AGAINST COLOUR SHADE AND PATTERN REF.ONLY BEFORE BULK SUPPLY.
CIRCUIT BREAKER 10A, 3POLE, TYPE-18 WITH AUXILIARY CONTACT 2NO FOR 3PHASE LOCOS
Contactor with surge suppressor for 60KVA transformer, Rated Current: 95A, Rated Voltage: 690V AC, 50/60Hz, Main pole: 04 Nos., Aux. Contact: 2NO + 1NC, Control circuit voltage: 230V AC +/-30% (168-300V AC) with plate & Rail Mounting support confirming to standard IEC/EN 60947. Place of installation: S1K44 in Switch Board Cabinet of LHB AC Coach as per RDSO spec. no. RDSO/PE/SPEC/AC/0184-2015 (Rev.1) or lat. and RDSO Ltr. No. EL/7.1.108/MSSBC Dt.: 17-09-21. Make as per BOM are ABB Cat. No.AF 116B-40, Schneider Cat. No. LC1D1150046M5+LA4DA2U only. Note: OEM or their authorized dealers are eligible to quote. In the case of authorized dealers, a valid and tender-specific authorization certificate from the original manufacturer shall be uploaded along with the offer, otherwise the offer may be liable to be ignored. Spec:RDSO spec. no. RDSO/PE/SPEC/AC/0184-2015 (Rev.1) or lat. and RDSO Ltr. No. EL/7.1.108/MSSBC Dt.: 17-09-21.
Sectional Telecommunication Maintenance Contract HPT-LD Section (excluding HPT & LD Stations) GIN-SNNR, LWR-AVA and UBL-KJG of Hubli Division.
Replacement of Control cum Indication Panel (CCIP) with Visual Display Unit (VDU) at 26 Electronic interlocking stations ( For 03 stations i.e Mugad ,Kyarkop and Bellary stations) over Hubballi Division.
Augmentation of facilities at coaching depot at Hubballi and construction of Bogie Repair Shed, LHB Spring shed at Hubballi workshop along with all associated works including Electrical and telecom works (Composite work).