Loading…
Loading…
10,242 results • Latest
SANDER BRACKET FOR WAG-9 LOCO
Holder for sander pipe
SET OF CABLE TIE WITH DIFFERENT SIZES
Hose connection for air suspension
Oil seal for compressor RR1000
AEB Over speed indicator
AEB Program switch to EMD pt
AEB on / off switch EMD pt no 40155174
25 SQ.MM, YELLOW COLOUR, ELECTRON BEAM IRRADIATION CURING PROCESS OR CHEMICAL CURING PROCESS THIN WALLED FLEXIBLE ELASTOMERIC CABLE WITH COPPER CONDUCTOR SUITABLE FOR ROLLING STOCK APPLICATION CONFORMING TO RDSO SPEC.NO.ELRS/SPEC/ELC/0019, REV.4, FEB-2018, 1.8 KV GRADE. NOTE: (1) ITEM/TYPE/MODEL/MAKE/BRAND FROM THE MANUFACTURER/SUPPLIERS AS APPROVED BY RDSOSHALL ONLY BE CONSIDERED. (2) CABLES SHALL BE SUPPLIED IN COILS OF 500 METRES LENGTH AND LEFTOVERQUANTITYIN MULTIPLES OF 100 METRES WITH A TOLERANCE OF +/-5% ON THE LENGTH. (3) FIRM SHALL INDICATE THE CURING PROCESS(E- BEAM IRRADIATION OR CHEMICAL CURING)IN THEIR OFFER.
AEB Speed selector switch 5 positions
Set of AS 659 electrical spare
Rail guard assembly as per CLW Drg.
Interior stickers with BRAILLE script
Sr.DEN/East/SBC Section: SW-I: Proposed construction of Type-II quarters (4 units) at Mulanur (MAR) station including electrical portion. SW-II: Proposed construction of Crew Lobby at Satellite Goods Terminal (SGT) including electrical portions. SW- III: ADEN/Bangarpet Sub division: Improvements of Divyangjan facilities at TCL, KSM, BSM, GDP, MAR, PU, COL, OGM, CHU, KQZ, SVS, CMY Stations including electrical portions. Maintenance period is 3 years. Composite Tender.
ADEN/Bangarpet Sub-Division: Proposed Construction of new S and T building including electrical portion at Bisanatham (BSM) station. Maintenance period is 3 years. Composite Tender.
Bengaluru Division: Provision of water cooler at KSR Bengaluru (SBC) - 14nos, Yelahanka (YNK) - 9nos, Bidadi (BID) - 1no, Champion (CHU) -1no, Coromandel (COL) - 1no. and Oorgaum (OGM) -1no. (Total - 27nos.). Maintenance period is 6 months or one monsoon period whichever is later
Bengaluru - Yeliyur Section: Extension of Bridge No. 455 at Km. 11/000-100 and Bridge No. 456 at Km. 11/462 at Kengeri (KGI) yard for yard improvements. Maintenance period is 4 years.
Sr.DEN/East/SBC Section: Proposed improvements to road surface of Level Crossing Gates in ADEN/Bangarapet sub-division in SBC-JTJ Section - LC Nos. 94, 96, 103, 118, 119, 122, 125, 126 and Yelhanka - Bangarapet section - LC Nos. 166, 163, 162, 124, 148 and Bangarapet - Marikuppam section - LC No.1 (Total - 14 LCs). Maintenance period is 6 months.
Sr.DEN/East/SBC section: Provision of Automatic signaling between Whitefield (WFD) - Jolarpettai (JTJ) section - Construction of Auto Goomties buildings including electrical portion. Maintenance period is 3 years. Composite Tender.
Bengaluru Division: SW-I: CTR(S) of exg 90R rails on CST-9 sleepers with 52kg 90UTS rails on 52kg PSC sleepers at 1540 density for a length of 7.05kms in FCI siding at WFD section in Sr.DEN/E/SBC Section (Balance Work). SW-II: CTR(S) of exg 90R/52 Kg Rails on CST-9/52 Kg PSC Sleepers with 52Kg/90UTS Rails on 52Kg PSC sleeprs at 1540 density for a length of 1.741Km in FCI siding at KJM yard in Sr. Den/E/SBC section (Balance Work).
Bengaluru - Yeliyuru section: Construction of Foot Over Bridge (FOB) at km 55/200 at Channapatna (CPT) yard near LC No. 47 (Gangway: 32.0 x 3.0m, Stair case: 2 x 3.0x 20m) for pedastrian movement. (4T Crossings). Maintenance period is 6 months or one monsoon period whichever is later.
Custom Bid for Services - Hiring of truck of loading capacity four point five MT and running upto 1500 km per month for the use of SSE Bridge BGM of Hubballi division for a period of three years, Custom Bid for Services - Extra for over item no 01 for every additional Km or part there of over 1500 Km up to 2000 Km in a month, Custom Bid for Services - Extra for over item no 02 for every additional Km or part there of over 2000 Km in a month Similar Category Goods Transportation service - Monthly Based Service Goods Transportation service - Monthly Based Service Goods Transportation service - Monthly Based Service
Copperalloy Taps/Stop Valves (V2) Conformingto IS8931 (Q3)
Stainless Steel Plain Washer
160 KVA DG SET.
Rectifier Fan Motor with Impeller
Electronic weighing balance with density
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
ANNUAL MAINTENANCE CONTRACT FOR CATERPILLAR ENGINES OF TRACK MACHINES WITH M/s. GMMCO LIMITED, BANGALORE FOR TWO YEARS (FY 2026-27 & 2027-28)
Design, Supply, Erection and testing of mobile PSI testing system for 25/ 2x25 kV traction system.
Comprehensive Annual Maintenance Contract (CAMC) for the Fire detection system of Vande Bharat Rake No.59 (Train No. 20663/64) for a period of 05 years
Hubballi Division: Proposed construction of precast goomties for LC gate at LC.No.316 at 517/300-400 Kambarganvi-Kashanatti (KBI-KHST) under Sr.DEN/HQ/UBL jurisdiction.(Maintainence Period-03 Years)
HUBBLLI DIVISION: Supply of water can to Level Crossing gates and gang units under ADEN/WEST/UBL Sub division for a period of 24 Months.
Hubballi Division: Proposed Construction of precast goomties for LC gates LC No's 80(KM 185/700-800)JML-BJP, 84 (193/500-600)BJP-MNL, 104(232/300-400) NBL- IDR, 4(8/700-800) UBL-KUG sections, under Sr.DEN/Central Jurisdiction. (Maintainence Period - 03 Years)
Hubballi Division: Proposed construction of precast goomties for LC gate at LC No.371 at Km 598/200-300 under Sr.DEN/West/UBL Jurisdiction (Maintenance Period : 03 Years)
Hubballi Division : Proposed Construction of precast goomties for LC gates at LC No's 6E at KM 5/600-700(BAY-OBM), 2E at 2/500-600 (BAY-OBM), 33E at 47/100- 200(SLM-RDG) and 6 at KM 6/900-7/000 (TNGL-BNHT) Under Sr.DEN/East Jurisdiction.(Maintenance period 3 years)
HUBBALLI DIVISION :- Supply of Water can to level crossing gates and gang units under ADEN/GADAG Jurisdiction (Total 25 gang units and 63 gates) for a period of 2 years.
Battery operated portable hand drilling machine
RELAY QL1 PLUG IN TYPE, STYLE MAGNETICALLY LATCHED
Supply, installation and commissioning of 128 port analog voice logger server
Supply, Installation, Testing and Commissioning of SMPS Based IPS