Loading…
Loading…
4,902 results • Latest
MTPS I CA CWS II Overhauling of existing I.D fan Gearbox for 1 No including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in Cooling Tower IV
MTPS I Mill Plant Unit II Dismantling hard facing and assembling of 1 meter length coal pipes after MOE mill outlet Elbow in Mill 2A to 2F during Capital overhaul 2024 25
MTPS I BM Lift Supply Erection and commissioning of Control Panel 1 No for Boiler Lift II of MTPS I
MTPS I Mill Plant Unit III Complete dismantling and reassembling of bowl assembly worm gear housing worm wheel mill bottom insulation cover plates broken main vertical shaft renewal of vertical shaft etc in Coal Mill 3F (Tilting work)
MTPS I Mill Plant Unit II Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom in any Mill 2A to 2F of Unit II
Supply of Hydrazine Hydrate
MTPS I Mill Plant Unit II Strengthening Rectification of raw coal bunkers 2A 2B 2C 2F leak arresting work by patch welding and Providing stiffeners during COH 2024 25
MTPS I Mill Plant Unit II Dismantling reconditioning overhauling and assembling of butterfly valves in mills feeder seal airline during 2A to 2F and Fabrication of various lengths of 40 NB cooling water pipe flange and assembling in the 2A
Mill Plant Unit II Applying two layers ceramic wear coat Eromat at mill outlet elbow Ceramic 90 deg bends released from Unit II during COH 2024 25
Construction of Control room building and allied civil works for the proposed 33/11 KV Substation at Thenpasiyar of Villupuram EDC in Villupuram Region