Loading…
Loading…
4,885 results • Latest
NCTPP III Mechanical I Circle Mill Plant Maintenance Division HVAC Complete overhauling attending defects and rectification works of 16 5 11 5 5 TR Air Cooled AC package units in GIS Plant water Switch gear and CCR Control panel room
NCTPS I SE MI circle AMC 25 26 BM Dn Unit III Routine Maintenance in Boiler Fuel Oil Cleaning Burner tilt Cleaning and attending Minor repair works and Routine Inspection and Cleaning boiler structure I and II pass in Boiler
SUPPLY OF 3.5 FEET V CROSS ARM AND 4.5 FEET V CROSS ARM
SUPPLY AND ERECTION OF 90 Deg in addition to 90 Deg FABRICATED CERAMIC COAL BEND FOR ZGM 133 G II MODEL VERTICAL ROLLER COAL MILL 4 ITEMS As per the drawing enclosed
NCTPS I SE MI circle AMC 25 26 BM Dn Unit II Routine maintenance in Boiler Fuel Oil Cleaning Burner tilt Cleaning and attending Minor repair works and Routine Inspection and Cleaning Boiler structure I and II pass in Boiler pressure parts areas
NCTPS I SE MI circle AMC 25 26 BM Dn Unit I Routine Maintenance in Boiler Fuel Oil Cleaning Burner tilt Cleaning and attending Minor repair works and Routine Inspection and Cleaning Boiler structure I and II pass in Boiler pressure parts
ICHP- Cleaning of coal dust accumulated in the cables, cable tray and cable tray structure etc., routed through conveyor structure alongwith the Conveyors-54,49,
ECHP-II- Strengthening of existing weak cable gallery structure from back side of SCH-II to near by old crusher by providing side support works.
Procurement of InSitu probe type CO gas analyzer with built in temperature measurement and its accessories 1 Nos.
Procurement of Smart positioner with feedback assembly Quantity 8 Nos