Loading…
Loading…
5,719 results • Latest
Clearing the debris, garbage, ash and other wastes etc., in Unit 4 and 5 and allied areas for the period from 01.04.2026 to 31.03.2027
10 80 Variable Load Hanger Assembly for condenser left and Right outlet pipes
Cleaning the Septic Tanks at various locations of ICHP and ECHP Office toilets, SS 2 to 6, PCH 1 and 2, SCH 1 and 2, etc. at ICHS areas for the period from 1.04.2026 to 31.03.2027
Cleaning the Septic Tanks available at various locations in Unit 4 and 5 A zone area and offices lying to the East of 457.5 E road in Stage 3 area for the period from 01.04.2026 to 31.03.2027
Cleaning of Toilets inclusive of water closets, urinals, wash basins, bath room floors, etc. in ICHP areas for the period from 01.04.2026 to 31.03.2027
Procurement of 200 sets of 22KV standalone structure material complete set