Loading…
Loading…
840 results • Latest
KTPS-V stage -EM and MRT- VPI Rewinding of 185KW, 6.6KV ADP (Ash Disposal Pump) motor, Sl.No 45187A 401-31-01-Reg
TGGENCO-CETD- Div-I-Supply of 500 MW Simulator Course Material during the year 2025-26- Quotation called for - Regarding
TGGENCO-YTPS-Supply of New Empty Oxygen Cylinders for BOP divisions of Unit-1 and 2/Stage-I/YTPS.
KTPS-V stage -CAM-Engaging of Tractor Including carrier for Transportation of material, T and P, MS ERW pipes, various scrap material, ash coal, silt and debris etc from section to ash Pond internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01.04.2026 (or from actual date of utilization) to 31.03.2027-reg
KTPS-V-CAM - Complete Overhaul of Transport Air Compressors 9A and 9B Model 1HB4BISNT KG KHOSLA make including Gearboxes New Allen berry make of Unit-09 Dry Ash Handling System.-Reg
TGGENCO KTPP CHP Servicing Charges for Annual Maintenance of Rack and Pinion type Elevator for Crusher House CHP 4 Visits for the year 2026 2027
TGGENCO KTPP CHP Servicing Inspection and trouble shooting of GE make PLC systems of Stage I II CHP and ACHP for the period from 01.04.2026 to 31.03.2027
KTPS VI Stage CAM Refurbishment of 200NB and 100NB Double Disc Valves of Air lock Vessels in Ash Handling System as and when required for the year 2026-27.
Supply of Adapter Sleeves suitable for Conveyor Pulleys (Drive, Non-Drive and Deflector) along with washer and locknut in CHP/YTPS.
Spares for 100 NB and 200 NB double disc valves