Loading…
Loading…
5,257 results • Latest
NCTPS I SE M II Circle AHP Dn Dismantling the damaged severely corroded walk way platform and fabrication erection of new walk way platform and its supporting structural over the newly provided structural column along the Ash Slurry Line No 1 to 5
Supply of STAY CLAMP FOR 9 MTR PSC POLE
NCTPS I SE M II Circle AHP Dn Complete cleaning of outer surface of Cast basalt lined MS pipe having OD 406 mm and painting the Epoxy Primer and Coal thar black paint in Ash slurry disposal line 2 and 3 from NCTPS II compound wall to Recovery water
Hiring of 1 No. Diesel / Petrol Driven VAN / JEEP for official use of Executive Engineer / OandM / South Kanchipuram
Supply of STAY CLAMP FOR 8 MTR PSC POLE
Supply of STAY SET COMPLETE
as per NIT
Provision of Annual Maintenance Contract
Supply of LT SINGLE PHASE CHANNEL CROSS ARM