Loading…
Loading…
4,446 results • Latest
Transporting of 3000 Nos. of 9.00 Mtr (200 Kg) PSC poles from PSC Yard Poothamedu to various locations in respect of Villupuram Electricity Distribution Circle, including loading, unloading, stacking, tollgate and Other incidental charges etc., for
System Transporting of 5000 Nos. of 8.00 Mtr (200 Kg) PSC poles from PSC Yard Poothamedu to various locations in respect of Villupuram Electricity Distribution Circle, including loading, unloading, stacking, tollgate and Other incidental charges etc
Execution of Capital Street light works in Thatchanallur, section of Urban Tirunelveli EDC in respect of the Technical specification in the enquiry
Enq.No.100-I 25-26 Supply of IDMTL Numerical Non directional 3OL and 1EL relay
Procurement of Various sizes of Carbon steel seamless pipes and fittings
Hiring of one No Diesel driven TATA SUMO (or) equivalent Vehicle for the daily official use of the Ex servicement squad /VDR for the period of one year
Hiring of one No Diesel driven TATA SUMO (or) equivalent Vehicle for the daily official use of the AEE/MRT metering/ VDR for the period of one year
Providing of 01 No Petrol Diesel driven vehicle Hire basis for the daily official use of AEE OM Vadalur
Vallam Vadagal 110/33kV SS
CONSTRUCTION OF DEPT VEHICLE BODY BUILDING AND CABIN WORK FOR ONE NO. NEW 10 TON DIESEL DRIVEN ASHOK LEYLAND LORRY TO AEE/D/ERUVADI/ VALLIYOOR DIVISION IN TIRUNELVELI EDC
Supply of LT Shackle Insulator
NCTPS -II - MI - MPM - Unit-II- Mill 2A to 2J Replacement Rectification of Hot air gate and its power cylinders, Hot air Damper, Cold air gates and its power cylinders and Cold air damper during Annual overhaul 2026-27
NCTPS II - SE MI - MPM Dn. -Unit II - Mills 2A 2B 2D -Reconditioning and Rectification of Multiple Port Outlet MPO and fixing of Ceramic Tiles during Annual Overhaul 6-27
NCTPS-II SE MI MPM Unit II Mill 2A to 2J Overhaul of lube oil coolers, cleaning removing of dust particles, sediments from lube oil tank of mills during Annual Overhaul 2026 27
NCTPS II - MPM - Unit-II -Mills 2A to 2J - Inspection and Rectification of mill discharge coal pipe line tie rod supports, coal pipe mixed air ducts supports during annual overhaul 2026_27.
NCTPS-II - M-I-MPM-Unit-II - Corner-4 - Overhauling of worn-out fuel inlet elbows along with shut off gates, special bends and orifice by dismantling lowering to boiler floor, rectification renewal, aligning and reassemblin
MPM Dn. - Unit-II - Mills 2F, 2G 2H Overhauling of MDVS, MPOS, classifier assembly, Mill outlet elbows and distance piece along with orifice rectification replacement of Mills 2F 2G worn-out transition chute and feeder outlet chute during Ann
NCTPS II- MI - MPM- Unit- II - Overhauling of Mill 2A to 2J feeder outlet gate and its power cylinder during annual overhaul 2026-27
Estimate for Repair, maintenance and allied Civil works at yard and compound wall of 33/11 KV Anna Bus stand SS in Madurai/Metro EDC, Madurai Circle, Madurai District
Hot Air Gate Cold Air Gate inner and outer seals, side and bottom seals and Hot Air Damper Cold Air Damper seal
Supplying and erection of precast POD toilet FRP septic tank for ladies and Gents and laying water supply sewage arrangements at Tunnel Power Houses Mettur Dam
NCTPS II M-I Circle - BM - Unit-II - AOH 2026-27-Replacement of the severely eroded and damaged A1, A2, B1 B2 stream Splitter assembly in flue gas duct at ESP inlet
32/26-27 DT 11.09.26 Supply of 20 Nos of Numerical Relay 3 o/c 1E/L
Provision of 1 No. Diesel driven Van/Jeep along with driver on hire basis for the official use of the Assistant Executive Engineer/Lines/ Kotagiri for a period of one year from the date of utilization
NCTPS II MI Circle - BM Dn.- Unit-II - Annual Overhaul of Flue Gas Duct - APH hopper area and ESP outlet to Chimney Inlet duct - Inspection, rectification of eroded Punctured duct portions by patch welding, renewal of damaged eroded bracing pipes
33/26-27 DT 11.09.26 Supply of 7000 Nos of 11kv Metal Parts for Rabbit/weasel
Providing of 1 No. Diesel Driven Car/Jeep/Van on hire basis for the daily official use of Executive Engineer/Operation/ Rasipalayam for a period of 1 year from the date of utilization
NCTPS II M-I Circle - BM - Unit-II - AOH 2026-27-Replacement of the severely eroded and damaged C1, C2, D1 D2 stream Splitter assembly in flue gas duct at ESP inlet
NCTPS II Mechanical I Circle Common Auxiliaries S.Dn. II Unit II AOH Overhauling of DM water transfer pump 2A 2B (Split casing two stage horizontal centrifugal pump-capacity 120 cu.mt at 60 mts. Head), its valve and RO-HP Pump-C
Supply of HT TI Fitting
Provision of Hiring Vehicle for the use of AEE Rural Aranthangi for a period of one yaer
31/26-27 DT 11.09.26 Supply of 500 Nos of LT TI Fittings
Provision of Hiring Vehicle for the use of AEE MRT Pudukkottai for a periof of one to three years
NCTPS II MI Circle - BM - Unit-II - AOH 2026-27 -Removal of accumulated ash from ESP outlet duct to Chimney Inlet
Supply of Tapping Channel Cross Arm
BM Dn. Unit-II Annual overhaul of Flue Gas Duct A Pass Inspection, rectification of eroded Punctured duct portions by patch welding and metal filling of welding joints, renewal of damaged eroded bracing pipes, expansion Joints
Providing protective treatment for the RCC structures at 0 mtrs. bottom level in 3 A and B Forebay of CWPH 1
NCTPP III Mechanical I Circle Boiler Maintenance Division Supply fabrication and Erection of 2 Nos Pipe rack for stacking the various Boiler tubes at TNPGCL Permanent Stores
CA-CWPH-Unit-II-Cleaning Grit blasting and applying a coat of zinc rich primer and brushable ceramic epoxy material to an average thickness of 2000 microns in condenser cooling water inlet cast steel pipelines of both A B passes in Unit-II
Supply of stay wire 7/12 SWG 15000 kg
CA-CWPH - Unit-II- Attending the leakages in the condenser cooling water inlet A B passes of GRP pipeline joints in the pipeline by well point jetting, dewatering, excavation and laminating with GRP material during the AOH for the year 2026-27
Cleaning and Patch up works to the Cold and Hot Water Tunnels of Unit 3
Estimate for Improvement works by providing galvalume sheet sunshade and allied Civil works at Control room of 33/11 KV Anna Bus stand SS in Madurai Metro EDC, Madurai District.
Supply of LT TI Fitting
Maintenance of Planted Avenue Trees in the Ash Dyke for a period of 6 months at TTP
Supply of LT Shackle insulator and LT Guy shackle.
BM UnitII Boiler Annual overhauling of Boiler Drum, Safety valves, Drum internals and Bottom ring headers in Unit II during 2026-27
Supply of Guarding Cross Arm
Boiler Maintenance Division - Unit II - 600MW Boiler - Annual overhaul of Air Pre Heater - 2A pass and its lube oil system and rectification of corroded, eroded and damaged inlet outlet ducts expansion joints of Air pre heater- 2A pass
MTPS I BM Unit III Boiler pressure parts AOH 2026 Disposal of Ash from Pent house Eco hopper deflection slope rear arch room boiler roof area strengthening of Eco hopper supports with new pipes and arresting of ash leakage in pent house and allied