Loading…
Loading…
4,447 results • Latest
Overhauling of Travelling water screen 2F and renewal replacement of defective parts with new or reconditioned spares after minor rectification, if necessary and thorough cleaning of stop log gate guide and seating area in the Fore bay chamber 2F
NCTPS-II-M-I-CA-CWPH-Unit-II Overhauling of Travelling water screen 2E and renewal replacement of defective parts with new or reconditioned spares after minor rectification, if necessary and thorough cleaning of stop log gate guide
NCTPS-II-M-I Circle-CA-CWPH- Unit-II-Inspection of internals, attending defects by dismantling the CWP 2E internal parts, rectifying and replacing the damaged parts with new or re-conditioned spares during AOH for the year 2026-27
NCTPS-II-M-I Circle-CA-CWPH- Unit-II- Rectification of worn-out/ oversized bearing housing of element column pipes, dismantling of worn out wear ring of pump casing and truness checking of all the released shafts from CWP 2E during AOH
Supply of 2350 Nos 22KV Tapping Channel Cross arm
Supply of 2570 Nos HT TI Fittings
MTPS I Mill Plant Unit III Complete dismantling of Mill internals reconditioning renewal of worn out parts and bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom Mill bottom cover plate etc
MTPS I Mill Plant III Complete overhauling of XRP 803 mill gearbox like mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly worn out flexible coupling etc in Mills 3A3B 3C and 3F
Supply of 9950 Kg GI wire 6 SWG
Supply of Stay Wire 7/12 SWG
MTPS I Mill Plant Unit III Overhauling of classifier assemblies Replacement Repairing of eroded inner cone inner cone drum section Venture vanes venturi collars during AOH 2026 27
Revisioning of IPCV
MPM III Ventilation system Overhauling of Unit II AB row Air washer system 1,00,000 CMH capacity centrifugal fans, water circulating system pumps and valves, cleaning of spray headers with branch pipes during AOH of 2026-27.
Supply of 7500 Nos LT Shackle Insulator
SE/CEDC/N/CBE/C/No.01/26-27
Supply of 8510 Nos LT GI pin
Supply of 6575 Nos Aluminium Knob
NCTPS II-SE MI Circle - MPM-III - Unit II - Ventilation system Fabrication and erection of air washer discharge duct after dismantling, removal of corroded worn out duct from blower outlet to AB row header in Unit II AB row air washer system in TG
NCTPS II-SE MI Circle MPM III AC Plant - Unit I II PHB SB dismantling of severely corroded and damaged air duct and fabrication, erection of new GI duct with MS structural frame by angle in Air handling unit dur
Supply of Aluminium Knob
Replacement of corroded
Rectification of deflector plate in Condenser cooling
Supply of GI Earth Pipe 10 Length
Replacement of various defective Constant
Replacement of corroded
Overhauling of various size of valves
Supply of FRTU Battery
Dismantling complete overhauling
Complete dewatering and Clearing of accumulated
RUNNING CONTRACT FOR RECLAMATION OF DIRTY OIL FOR A PERIOD OF ONE YEAR
Supply of LT Three Phase Angle Cross Arm
MTPS I Mill Plant Unit III Dismantling reconditioning overhauling and assembling of dia 250 mm butterfly valves in mills and seal air fan damper assembly of size dia 650mm in the seal air system during AOH 2026 27
Supply of 20000Nos of LT Shackle Insulator
MTPS I Mill Plant A C Plant Unit III AOH 2026 27 Air Washer System Epoxy painting of blowers spray room and its auxiliaries Spray nozzles flushing and works replacing the damaged 200 NB GI header pipe Overhauling the AWCW Pumps etc
Supply of Various sizes of M.S.Bolt and Nuts
MTPS I Mill Plant Unit III Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 3A to 3F and Dismantling of seal air fan motor and overhauling reassembling and setting etc
TTPS Mech II BM Unit I to V Attending Boiler tube puncture in Unit I to V Boiler from the date of handing over of site to 31 03 2027 or till the date of completion of entire quantity whichever comes earlier
MTPS I Mill Plant Unit III Dismantling and assembling of fuel inlet Elbows and Hard facing of Fuel inlet Elbows long and short during Annual overhaul 2026 27
Supply of Stay Set Complete
MTPS I Mill Plant Unit III Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills and Renewal of the worn out Mill
MTPS I Mill Plant Unit III Applying two layers ceramic wear coat Eromat at mill outlet elbow released from Unit III during Annual overhaul 2026 27
MTPS I Mill Plant Unit III Overhauling of gravimetric feeders and clean out conveyor of mill 3A to 3F during AOH 2026 2027
Hiring Vehicle for SE PA MTPS2
Improvement estimate for replacement of deteriorated structure in Unnioorkonam SS III 100 KVA in Kulasekharam Feeder under R KLM Section
NCTPS-II-M-I Circle-CA-CWPH- Unit-II- TWS 2D-Inspection of Travelling water screens 2D boot section assembly by complete dismantling of basket trays chain link plates, dewatering the fore bay TWS chamber, fabricating water screen frame steel
Improvement estimate for avoid overload of Orapanavilai SS I 250KVA DT by providing 1no 100 KVA DT by Orapanavilai SS I 250 KVA DT under Thuckalay Section
MTPS I Mill Plant Unit III Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces fabrication of spool piece Multiple port outlets etc and Hard facing of vertical coal pipe 1mtr length after Transition piece in
NCTPS-II-M-I-CA-CWPH-Unit-II-Dewatering to facilitate cleaning of cooling water inlet lines from CWPs 2A to 2Fs discharge elbow to condenser inlet, cleaning of condenser cooling water inlet lines from manhole 3 to manhole 4 of both A B pass and