Loading…
Loading…
4,509 results • Latest
MTPSI ES Circle CI FSSS 3 4 Annual overhauling of retractor assembly of HEA ignitors flame scanners Pr. Gauges switches, DP switches, Temp gauges switches, Transmitters, SADC positioners, HAG solinoid valves etc in Unit-III for the year 2026-202
MTPSI ES Circle MRT UnitIII TG area AOH maintenance works to be carried out for the year 2026 27 in the Electrical valve actuators Generator Transformer UAT A and B and DVR equipments in TG area
MTPSI ES Circle MRT Unit III Boiler area Electrically operated valve actuators and soot blowers Carrying out the maintenance works during Annual overhaul for the year 2026 27
Supply of White Cotton Belt Rope 16 mm Dia. and Rubber Hand Gloves and Rubber Hand Gauntlets AS PER RESPECTIVE SPECIFICATIONS
MTPS I BM UNIT III Boiler pressure parts Replacement of worn out pipe lines Bends and Flanges of LRSB lines and Removal of insulation and refixing over LRSB line pipes and bends after completion of work etc
Supply of 11KV Polymer Composite Pin Insulator with Pin
Supply of RAIN COAT
Replacing damaged AC Sheet by new one
Procurement of 35500 Nos of 9 m 300 Kg Working Load PSC Poles for effecting Agricultural Services in All Distribution Regions
Supply of 33KV Polymer Composite Pin Insulator with Pin
Providing Cable Duct,Septic Tank, Shifting of Toilet, Modification of existing Battery room and Dismantling of Toilet at Existing Chitlapakkam 33/11 KVSS premises in Chennai EDC / South-II
MTPS I BM Unit III Boiler AOH 2026 Re conditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works
Construction of Office Building to accommadate the AEE O and M Sithalapakkam, and AE O and M Arasankazhani with cash collection center in the Proposed Arasankazhani 33 / 11 KV Indoor SS in Sholinganallur Division of Chennai EDC / South.II
MTPS I CA CWS II Unit III Overhauling of 1600 mm BFV in CWP discharge line including Actuator Gearbox Overhauling checking renewal of Nitrile rubber seal Replacement of eroded corroded portion of bolt fixing area in Intake Screens of CWPs 3A 3B 3C
Supply of 22KV STANDALONE COMPLETE SET WITH 22KV POLYMER INSULATORS
Supply of TAPPING CHANNEL CROSS ARM
Engaging of additional Manpower of 6 Persons per day per each sections of Urban Ranipet sub division
Engaging of Additional manpower of 6 persons per day per each sections of Walaja Sub division
LT THREE PHASE CHANNEL CROSS ARM
Engaging of additional Manpower of 6 Persons per day per each sections of Sipcot sub division
MTPS I BM Unit III Boiler Pressure parts AOH 2026 Overhauling of HP LP valves and replacement of defective valves
Supply of STAY SET COMPLETE
MTPS I BM Unit III Boiler pressure parts AOH 2026 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger at boiler IInd pass area
Procurement of Filler Pump Assembly for SAN Locomotive 1 No
Procurement of Spares for Induced Draft Fan 24 Nos
Supply of 11 KV, Single Bus, 25KA, 1250Amps Indoor Vacuum Circuit Breaker Panels.
NCTPS I SE MI circle RM 26 27BM DnUnit III Strengthening of corroded Damaged supporting structures in boiler walk way and operation platform at 16 Mtr to24 mtr and renewal of existing floor grill hand rails and Painting structures in 1st pass
NCTPS I SE MI circle R and M 26 27 TM Dn Reconditioning of BFP defective NRV released from Unit I II III OH and Dynamic balancing with trueness of BFBP shaft with Impeller for critical Vital inventory
NCTPS I SE MI circle RM 26 27MPM DnAC Plant Attending breakdown works in LG 140TR water cooled screw chiller compressor No1
NCTPS I SE MI circle RM 26 27MPM AC Plant Erection Testing and Commissioning of new condenser and evaporator unit in LG Make 140TR water cooled screw chiller assembly no1
Supply of BACK CLAMP FOR 9 MTR PSC POLE
AMC charges of one number goods cum passenger emergency lift operating from KPH Cavern to Switchyard of M s Thyssenkrupp elevator India ltd Make Lift No SO 420 capacity 1088kg 16 persons at KPH for the period of 1 year from the date of utilization
Providing watch and ward for safe guarding the office of the Superintending Engineer and other division and subdivision offices in the GCC campus for the period of 1 year from the date of utilisation
Sinking of Borewell and supply of motor with water supply arrangements for accommodating the section offices of AE South Podanur AE NorthPodanur and Sub division office of Podanur in the vacant land of Erstwhile Podanur sub store premises
out sourcing of computer typing operator /data entry operator to carry out the day to day data entry works through licensed contractor on need basis in EE/TRB/Arasur at central office premises for a period of 12 months from the date of utilization
Improvement work by raising the floor and GI sheet for sunshade to AE Town SMR and AE Rural SMR section in 110 11 KV SMR SS
Supply of Scrapper and Guard Assembly for HP 803 Bowl mills
STAY SET COMPLETE
LT THREE PHASE ANGLE CROSS ARM
LT THREE PHASE CHANNEL CROSS ARM
22KV STRUCTURE CLAMP FOR 9Mtr PSC POLE 400 Kgs
22KV STRUCTURE MATERIALS FOR 9Mtr PSC POLE 400 Kgs
Sale of Scraps and Empties in AS IS WHERE IS CONDITION available at Central Stores GCC Karamadai Coimbatore 641104 through e-tender cum auction with forward bidding
Hiring vehicle for the official use of the Executive Engineer/ Distn/ Tiruchendur for one year period
MTPS-II-M-II-CHP-II Reconditioning and testing of Wagon Tippler clamping cylinder which retrieved from Wagon Tippler 5 and 6
Hiring Vehicle for Executive Engineer/ TRB/GCC-II/ Chennai
Hiring Vehicle for Assistant Executive Engineer/SSE/GCC-II/ Chennai.
TTPS Operation Circle MPM II Unit V Mill 5B Erection of 1 no of Coal Valve for Coal Bunker Feeder of HP 803 Bowl Mills 36 inch Chain Operated
TTPS Operation Circle Revenue work OE II FPS Scrapping, Cleaning and painting of one coat of red oxide primer and two coats of P.O.Red Blue enamel paint in Mulsifyre pipelines of various sizes at Unit II GT 3 phase transformer and UAT 2A and 2B
MTPS-II-M-II-Circle-CHP-I Division - Providing working platform at Conveyor 6A/B takeup to facilitate the takeup pulley maintenance and to ensure the safety during belt replacement works.