Loading…
Loading…
6,332 results • Latest
SUPPLY, ERECTION, AND COMMISSIONING OF 200 NB M.S. SEAMLESS PIPES AND BENDS FOR UNIT I HEAVY OIL DISCHARGE LINE FOR A LENGTH OF 300 MTR REACH II, FROM ESP III TO UNIT I OIL HEATING STATION
TTPS Mech II AHP Unit I Breakdown maintenance of ECO APH hoppers ash disposal system for the period from 01 04 2026 to 31 03 2027
Protection arrangements in the Cross Bund Spillway Main Spillway by Shifting and Laying available Concrete Pedestals 1.50 MT to 3 MT approx. from Switchyard to Downstream of Cross Bund Spillway Main Spillway at TTPS
TTPS Operation Circle CMP Annual Maintenance contract of local area network components in various offices of TTPS for the period from 01.04.2026 to 31.03.2027
ICHP- Attending preventive mechanical maintenance of Bull Dozers.
TTPS Operation Circle Chemical Division Testing and analysis of Fuel lab for the period from 01.04.2026 to 31.03.2027