Loading…
Loading…
6,332 results • Latest
Epoxy Painting for 5 Nos of Unitary Air washer units 1 No blower in Masonry Air Washer unit and 3 Nos of Cooling Towers of Chiller unit during AOH COH 2025
TTPS Operation Circle CAD CWPH I Lifting of the trash rack screen from the CWPH I fore bay, cleaning of the debris and re erection in its position for Unit I, II, III for the period from 01.04.2026 to 31.03.2027
TTPS MechII AHP Breakdown Overhauling of Ash Water pump filteration plant valves etc in units IV V for the period from 01 04 2026 to 31 03 202
ICHP- Picking up of stones and foreign materials, water wetting of coal/ covering and removing the HDPE sheet on the coal in the coal yard as and when required in the day time.
TTPS Operation Circle Chemical Division Collection of Coal Samples from Bunker of all the 5 units Coal Jetty I Collection of Pulverised Coal samples for Sieve analysis Collection of MOT oil Lub Oil samples and other oil samples like Mill Gear Box O
TTPS Mech II AHP Unit II Breakdown maintenance of ECO APH hoppers ash disposal system for the period from 01 04 2026 to 31 03 2027