Loading…
Loading…
6,046 results • Latest
Hiring of Vehicle for the daily use of the Asst. Executive Engineer / Spl MTcn / Virudhunagar
Construction of RCC Protection wall at Ch.54.00 M from the back wall of the Sholayar Power House I to avoid saddle water entering into the Power House
Construction of RCC Protection wall at Ch.26.00 M from the back wall of the Sholayar Power House I to avoid saddle water entering into the Power House
Improvement works to the existing of Flume channel running between Marapalam Weir and Punachi Pick Up weir by providing RCC for the bottom portion with bed slope of 1 in 300 and sides of the trapezoidal Channel with a slope of 1 in 1 from
Construction of RCC Protection wall at the Earth slipped area at 6th bend and providing support to the rock to avoid slippage along the road at 8th bend leading from Dam Left flank to Dam Right Flank at Upper Aliyar Dam
Construction of RCC Protection wall at the earth slipped area at Chainage 100 m from Y Junction along the road leading from Kadamparai dam Y Junction to Vandal dam at Kadamparai Power House