Loading…
Loading…
6,644 results • Recent activity
MTPS I M I CA CWS II Unit III and IV Strengthening of most eroded corroded portion of Cooling Tower ID Fan gear box base bed frame in Cooling Tower III and IV
MTPS I CA CWS II Unit III Replacement of Eroded Corroded Safety grill Hand rails and painting in Cooling Tower III
MTPS I M I CA CWS II Unit III Fabrication and erection of sun shield monitor roofing structure with roofing sheets for replacing the damaged Corroded roofing structure with sheets etc
MTPS I Boiler Rotating parts Units I and II Preventive and Breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work for the year 2025 26
MTPS I Mill Plant Unit IV Hard facing of MS bend and multiple port outlets in coal flow lines Fabrication of MS bend 15 22 deg to suit dia 508 mm 12 7 mm thick coal pipe line during AOH 2025 26
MTPS I Mill Plant Unit IV Inspection and renewal of eroded 08Nos of orifices dia 415 mm 02 Nos dia 406mm 01No dia 400mm 02Nos dia 410mm 02Nos dia 396mm 01No in the coal pipe line of coal flow system at boiler side 08 Locations