Loading…
Loading…
79 results • Latest
Extension of domestic water supply connection to individual household within DWS Sub Division No II Agartala (2nd call)
Repairing of different capacity and make Submersible Pump under DWS Sub Division No II Agartala
Shifting of existing DWS pipe lines from Subhashpalli (Gouranga karmakar house) to Champamura (Near Gas Go Down) due to widening of existing road (L 770.00 mtr) under AMC Ward No 26 (Deposit Work) (2nd call)
Brick Work Plastering GS Sheet roofing flooring painting of pump house plastering and painting works of conventional type IRP replacement of filter media at horizon colony Conventional IRP concreting of surrounding areas construction of boundary wall
Construction of RCC road Earth filling Sand filling Brickworks etc within DWS Sub-Division No I Collegetilla
Hiring of M and M Bolero Neo BS6 diesel run Year of Make 2025 onwards along with driver for the Executive Engineer Office of the CEO Head Office Tripura Jal Board UDD Bhawan 2nd floor Sakuntala Road for a period of 1(One) Year
providing pump operator for operation of different sluice valve at GS Section OHT Science Building OHT for 2 years period including repairing and mtc of different centrifugal pump motors of different scheme under GS Section under DWS SD No I
Mtc of different dia pipeline with providing pipes fittings and essential accessories including connection of domestic connection those are damaged road mtc etc with other allied works under DWS Sub-Division No I Collegetilla Agartala
Repairing and maintenance of pipe line leakage block washing and some other allied works at Aralia and Kashipur Zone
Lifting and Lowering of VT pump motors set including repairing and mtc of VT Pumps under DWS Sub Division I Collegetilla (Group-II)
Providing and fitting fixing of Electrical Accessories including other allied works under the jurisdiction of DWS Sub Division II Milansangha Agartala
Providing and fitting fixing of Electrical accessories for 4.0 MGD SWTP at Bordowali in/c intake well under DWS Sub-Division No-II Milan Sangha Agartala during the year 2025-26 under DWS Division Agartala-I within AMC South Zone Agartala Tripura
Shifting and disconnection of domestic connection in/c all allied necessary works for pipeline mtc under DWS Sub Division II Milonsangha Agartala
Labour charge for deploying pump operator at Rajbari Boosting Station OHT and DTW Schemes and IRP within the jurisdiction of SB Section under DWS Sub Division No I Collegetilla Agartala
Repairing of different capacity and different make submersible motors under DWS Sub Division II Milansangha during the year 2025 26
Rejuvenation and Beautification of IDSMT POND at ward No. 04 Under Kailashahar Municipal council area, Kailashahar
Construction of 1 Package type IRP Unit of capacity 10000 GPH x 2 MS Vessel
Maintenance of Package type Iron Removal Plant (IRP) of Sharma Bhaban office lane during the year 2025 2026 (Deposit Work)
Retrofitting of columns beams walls repairing of plasters repairs of window glass railling cover slab casting painting works steel works Roof treatment Beautification at plant area etc under DWS Sub Division I collegetilla Agartala during the year
Providing and installation of different capacity pump with motor at different DTW schemes under the jurisdiction of DWS Sub Division No. I, Collegetilla, Agartala during the year 2025 26
Construction of Temporary Seasonal Bundh in the river bed of Howrah near Intake well of 3 MGD wear treatment plant etc under DWS Sub Division No. I, Collegetila, Agartala
Lifting and lowering of submersible pump motor along with other allied works within DWS Sub Division II Milansangha Agartala
Shifting of existing DWS pipe lines at Kashipur Mission road due to widening of existing road (L 900.00 mtr) under AMC Ward No 09 (Deposit Work)
Providing and Installation of Pipeline Inspection crawler robot, a non-motorised inspection camera for pipe line inspection and AI based Assessment Technology
Water Supply Arrangement within Agartala City under AMRUT 2.0 within AMC Area
BEAUTIFICATION OF SONAMURA RESERVE TANK, UNDER SONAMURA NAGAR PANCHAYAT, SEPAHIJALA DISTRICT, TRIPURA
Construction of Boundary Wall in front side of Sub Divisional Office complex under DWS Sub-Division II, Milonsangha Agartala during the 2025 26
Construction of RCC road sand filling brickworks providing GCI sheet roofing trusses wire mewsh earth filling jungle cutting etc within DWS Sub Division I Collegetilla Agartala during the year 2025 26 (3rd call)
Sinking of 1(one) nos SBDTW at the backside lawn (near the security barrack) in the High Court Complex under the jurisdiction of DWS Sub Division III Kunjaban Agartala (Deposit Work)