Loading…
Loading…
215 results • Latest
CONSTRUCTION OF V.R.B AT KM 4.740 OF MUBARAKPUR MINOR.
CONSTRUCTION OF ROAD AT RIGHT BANK OF CHANDAUSI BRANCH FROM KM 40.860 TO KM 40.945
Construction of RCC trough from Km. 16.570 to km. 16.910 of Left Kanhar Canal.
Railway track crossing by pipe pushing method at KM/TP-66/27-29 and KM/TP-66/28-30 between stations MXY and DXN of East Central Railway BOMB MINOR at Km. 2.925 and KM/TP-64/29-31 and KM/TP-64/30-32 between stations MXY and WDM of East Central Railway
Construction of Drainage Syphon at Km 1.760 of Escape of Chandausi Branch.
SCRAPED SILT FROM KM 23.530 TO 24.581 AND FROM KM 24.590 TO 25.230 RIGHT BANK AND FROM KM 24.590 TO 25.230 LEFT BANK ON BARABANKI BRANCH
SCRAPED SILT FROM KM 26.435 TO KM 28.438 RIGHT BANK ON BARABANKI BRANCH
SCRAPED SILT FROM KM 19.625 TO KM 20.000 RIGHT BANK ON BARABANKI BRANCH
SCRAPED SILT FROM KM 20.315 TO KM 20.700 RIGHT BANK ON BARABANKI BRANCH
SCRAPED SILT FROM KM 3.526 TO KM 5.049 RIGHT BANK ON BARABANKI BRANCH