Loading…
Loading…
3,941 results • Latest
Earth work in silt clearence of Lahraura mr. From km 0.000 to km 3.000
CONSTRUCTION OF VRB ON RAUNA DY AT. KM. 1.400
SILT CLEARENCE FROM KM 0.000 TO KM 1.700 AND BED BERM SCAPING FROM KM 1.700 TO KM 4.300 ON DUMARI MR.
SILT CLEARENCE FROM KM 0.000 TO KM 2.100 ON MURADPUR DY.
BED AND BERM SCRAPING FROM KM 0.000 TO KM 0.500 AND KM 4.200 O KM 5.800 OF VISHUNPUR DY
SILT CLEARENCE FROM KM 0.000 TO KM 1.600 AND BED, BERM SCRAPING BETWEEN KM 1.600 TO KM 4.200 ON RASOOLPUR MR.
SILT CLEARENCE FROM KM 0.000 TO KM 1.800 AND BED BERM SCRAPING BETWEEN KM 1.800 TO KM 4.600 ON BASTHANWA MR.
SILT CLEARENCE FROM KM 0.000 TO KM 1.000 AND BED BERM SCRAPING BETWEEN KM 1.000 TO KM 2.600 ON SANSARPUR MR.
Clearance of Pakdi Nasir Link Drain from KM 0.000 to KM 2.100 in District Basti
Clearance of Aama Drain-1 from KM 0.000 to KM 1.300 in District Basti
Clearance of Naseebgunj Drain from KM 0.000 to KM 2.900 in District Basti
Clearance of Gajadharpur Drain from KM 0.000 to KM 7.000 in District Basti
Clearance of Jamdashahi Drain from KM 0.000 to KM 5.350 in District Basti
Clearance of Majhaura Drain from KM 0.000 to KM 2.100 in District Basti
Clearance of Dhaurahra Drain from KM 0.000 to KM 2.400 in District Basti
Clearance of Pakaddand Drain from KM 0.000 to KM 2.700 in District Basti
Clearance of Piprahiya Drain from KM 0.000 to KM 1.550 in District Basti
1. Construction of spur at Km 22.180 of Elgin Bridge Charsari embankment situated on the left bank of Ghaghra river in Gonda district and planting of porcupine in three rows between Km 22.430 to Km 22.710 and Km 22.730 to Km 23.030.
Clearance of Kasaila Drain from KM 0.000 to KM 3.800 in District Basti
Clearance of Kusumahiya Drain from KM 0.000 to KM 1.500 in District Basti
Clearance of Parsa Hazzam Drain from KM 0.000 to KM 4.800 in District Basti
Clearance of Aihalwa Drain from KM 0.000 to KM 2.900 in District Basti
Clearance of Tenuichet Drain from KM 0.000 to KM 1.900 in District Basti
Clearance of Baida Drain-2 from KM 0.000 to KM 3.000 in District Basti
Clearance of Surwarkala Drain from KM 0.000 to KM 3.100 in District Basti
Clearance of Pakdi Nasir Drain from KM 0.000 to KM 3.600 in District Basti
Work for construction of footbridge on Nagariya Minor under the fourth subdivision for the year 2025-26 (At km. 1.650).(Lot 19)
Auction of Silt/Sand Placed at left and right bank of Laharpur Dy from km. 0.000 to2.000 (Lot-36)
Auction of Silt/Sand Placed at left and right bank of Khairabad Dy from km. 32.000 to 42.000 (Lot-34)
Auction of Silt/Sand Placed at left and right bank of Ataria Mr from km. 0.000 to 0.500 (Lot-21)
TN-01/EE/2025-26 Reconstruction work of the bridge built at Km 30.274 of Rajwaha Right Salawa.(Lot-7)
Rajwaha Sidholi Ke Km 10.466 Par Chatigrasth VRB CumFall Ke Punh Nirman and VRB ke Upstream and Downstream me CC Lining Ka Karya
Earth work in Bed and Berm Scrapping of Gangwal Mr. from K.M. 0.000 to K.M. 6.900
Earth work in silt clearence of Basantpur mr From km 0.000 to km 9.180
Construction of Canal From 0.745 to 0.885, km. 3.592 to km. 3.628, km. 3.750 to km. 4.040, km. 5.050 to km. 5.134, km. 5.420 to km. 5.430, km. 5.480 to km. 5.750 km. 5.800 to km. 6.126, of Sherpur Mr.
construction of canal from km. 2.085 to km. 2.140 km. 3.000 to km. 3.100 and km. 5.580 to km. 5.660 of Babaina Mr. (Lot- 14)
construction of canal from km. 21.705 to km. 21.725 and km. 21.830 to km. 21.840 of Panwasa Dy. and km. 0.0135 to km. 0.0200 km. 1.310 to km. 1.350 km. 3.380 to km. 3.450 and km. 5.450 to km. 5.580 of Adampur Mr. (Lot-13)
construction of 11 no. outlet km. 0.000 to km. 3.688 left and right bank of Rajpur Mr. (Lot-08)
construction of canal from km. 2.180 to km. 2.235 of Raipur Mr. (Lot-12)
construction of 10 no. outlet km. 0.000 to km. 4.900 left and right bank of Bhartra Mr.. (lLot-04)
As per Tender Notice No. 03/S.E./2025-26 Lot 1
TN-01/EE/2025-26 Reconstruction work of damaged bridge located at Km 12.310 of Rajwaha Bahadurgarh.Lot No-51
TN-01/EE/2025-26 Reconstruction work of damaged bridge located at Km 7.150 of Rajwaha Bahadurgarh.Lot No-50
Earth work in silt clearence of Sarsa mr. From km 0.000 to km 3.000
Earth work in silt clearence of Baragoan mr From km 0.000 to km 4.000
Earth work in silt clearence of RAJAPUR MINOR. From km 0.000 to km 5.800
Auction of Silt/soil work from Km 115.00 to Km 116.600 of Bhognipur branch
Earth work in silt clearence of Sarva mr. From km 0.000 to km 3.600
Lot 1 Construction of VRB at Km. 1.100 of Thati Minor
Earth Work in Bed and Berm Scraping of Dharasawan Minor from Km. 0.000 to Km. 4.200