Loading…
Loading…
6,281 results • Latest
Maintenance of SRG ARG stations pertaining to Ground Water Sub Division IV Chennai 113 for the period from August 2026 to February 2027 for the Year 2026 and 2027.
Construction of Machinery and Processing shed 117.87.Sq.meter
CONSTRUCTION WORK FOR VEGETABLES COLLECTIONS CENTER SHED 83.99 Sq.meter FOR KASHTAKRUSHI MAHILA FARMER PRODUCER COMPANY Ltd AT- SHIVALE TAL-MURBAD DISTRICT-THANE
Construction work for Shed 85.04 Square Meter for Shetirani Mahila Farmer Producer Company, Padgha, Taluka-Bhivandi,District- Thane.
Conservation work of Mahi river bank located at Shrigeshwar Temple on Mahi river.
Selection of Consultant for preparation Detailed Project Report for the Construction of Barrage and 50 MLD raw water pumping station at Ordhofond, Poinguinim, across Talpona river for augmentation of Minor Irrigation Tank at Gavanem for uninterrupted
Manufacturing of Metal CRCA Sheet Cabin for Power Pack of Quick Closing Gate Hydraulic Hoist including Material, Fabrication Erection, Painting Transportation at Aruna Medium Project Tal Vaibhavwadi District Sindhudurg.
Periodic Operation and Maintenance of all gates of Tillari Dhamane dam for radial gate size of 12 X 5 mtrs 3 Nos. and outlet gate and Emergency gate for 120 days at Tillari Dhamne project
Construction of Parent Shed (278.66 Sq.M.), Hatchery Building (278.66 Sqm), Shed For Grower (371.55 Sq.M.) Feed Mill Shed (185.77 SQ.F.), Cold Strong Room(18.57 Sq.M.) ,Storage Tank (18.57 Sqm), Disposal Pit (18.57 Sqm)
Supply, Installation, Commissioning and Testing of Papaya and Fruit Dehydration Unit 1 TPD