Loading…
Loading…
6,414 results • Latest
Special watch and ward and protection of ghhaghar flood water from chetak point to 56 GB Ramsinghpur year 2026-27
Special Watch and Ward protection of Ghaggar flood water from 56 GB Ramsinghpur to Indo-Pak border for year 2026 2027
Urgent Repairs Works of K.T.Weir Bandalgi Tal. South Solapur Due to Flood in Sina River Sept. 2025
Repairs work of damaged canal lining in Kurul Branch Canal Km. No. 43 (Ch.42/290 to 42/ 790)
Repairs to Damaged Lining of Ujjani Left Bank Canal Dy. 38 in Km. 1 to 21
Stabilization of nallah banks and flood protection measures in Sy. No. 53-1 in Orel in Village Assolna in Salcete Taluka. (2nd Call)
Construction of sluice gate for the Sapal Curli Cantor bund at Vanxem Loutulim in Nuvem Constituency of Salcete Taluka. (2nd Call)
Repairs to CC lining at Km 1 and Km 4 of Barad Dy,Repair and maintanance of VRB at Km 1 of LM 10 of Tirakaswadi Branch Canal including Carrying out irrigation management work in Rabbi and Hot weather season 2025-26 under U.P.I.Section No.19
Repairs to structures and CC Lining on Mendaka Dy, Mudkhed Dy No.1, and Dongaon Dy including Carrying out Irrigation management work of controlling canal in Rabbi and H.W. season of IRBC Under UPI Section no.21 Mudkhed
Providing Railing to VRB in Km 30, 31 and 33 of IRBC, Repairs to HPC in Km 33 of IRBC including Carrying out irrigation management work in Rabbi and Hot weather season 2025-26 under U.P.I.Section No.07 Akhada Balapur