Loading…
Loading…
6,451 results • Latest
Opening and Fixing Gates of 18 Nos Barrages for the Year 2026-27 Under Water Resources Sub Division Deori.
Raincuts Filling With Pitching and Down stream Slope Drain Cleaning at Atal Sagar Madikheda Dam
Supplying Man power by Out Sourcing for Irrigation Management work and preparing Assessment sheets(Akarani Patrake) of as sectional Offices under Arphal Irrigation Subdivision, Masur.
Repair work to the drains at Arch culvert at Ch. 17/016 of Ujjani left bank canal and providing approches on one side of Arch culvert near Shevare, Tal. Madha, Dist. Solapur
SUPPLY INSTALLATION OF HIGHMAST LIGHT, STREET LIGHT AND DRILLING OF TUBEWELL & INSTALLATION OF MOTOR PUMP AT GARDEN OF SARADIH BARRAGE UNDER HASDEO BANGO PROJECT DISTT. SAKTI.
SURVEY, DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING and COMMISSIONING OF TOTAL 52.37 KWP OF ON GRIDCONNECTED ROOFTOP SOLAR PVPOWER PLANTINCLUDING COMPREHENSIVE MAINTENANCE CONTRACT (CMC) FOR 3 YEARS
Carrying out Lining, Pitching and Structural works under irrigation section Kandhar, irrigation section Pethwadaj and Upper Manar Project, Tal. Kandhar, Dist. Nanded.
Removal of debris, mud, aquatic weeds from Khazan fields (creek) Phase- II at Soncrem in V.P. Shiroda of Ponda Taluka
CONSTRUCTION OF BALANCE WORK OF 1 KM WBM ROAD ALONG THE RISING MAIN OF SHIRAPUR LIS STAGE-II WITH 3 HPC AT CH 0330 CH 1150 AND CH 1320 AND CONSTRUCTION OF BALANCE WORK OF 2.5 KM WBM ROAD ALONG THE RISING MAIN OF SHIRAPUR LIS STAGE-I WITH 2 HPC AT CH
Removal of debris, mud, aquatic weeds from Vaale Khazan field (creek) in V.P. Shiroda in Shiroda Constituency of Ponda Taluka