Loading…
Loading…
6,432 results • Latest
CONSTRUCTION OF LAND DEVELOPMENT WORK(PART-1) FOR DIRECT OUTLETS OF PILANDRI DY. CH NO. 0 TO 7700 M OFFTAKING FROM PENDHARI BRANCH OF NERLA LIS.
CONSTRUCTION WATER USER ASSOCIATION BUILDINGS BHAGIRATH (MAUZA- BACHEWADI),SUJLAM SUFLAM (MAUZA- ASGAON),JIJAMATA (MAUZA- ATHALY),SHETKARI KISAN (MAUZA- MANDED) .
PROVIDING THE LABOURS FOR THE ROTATION AND MANAGEMENT OF SUMMER IRRIGATION FOR YEAR 2025-26 ON THE BRANCH CANAL NO.2 BRANCH CANAL NO.3 OF GOSIKHURD LEFT BANK CANAL
Construction of 125 x 115 mm dia x 70 m depth drilled tube well with installation of IM-II Hand Pump, lowering 32 mm GI pipe with platform and drain at 24 Nos. of different Anganbadi Centres of District - Ramgarh for the year 2025-26
Construction of Retaining wall At Chainage 2180 m For First Row Of Rising Main and near Pump house no 1 Under Guruvarya Late Laxmanraoji Inamdar Lift Irrigation Scheme (Jihe Kathapur) Dist- Satara
Carrying out Furniture renovation work of Executive Engineer, Quality Control Division, Satara office and painting work of store room and division Office, Carrying out maintenance and repair work of Soil Laboratory and Material testing Laboratory of
Stabilization to the bank of nallah and supply and laying of pipes near bandhara at Kanote in ward No. 02 of V.P. Shiroda of Shiroda Constituency
Construction of Bituminous Approach Road for Pump House and Delivery Chamber of Ner Lift Irrigation Scheme No. 1 and 2 under Late Guruvarya Laxmanraoji Inamdar Lift Irrigation Scheme. ( Jihe Kathapur) Dist. Satara( Jihe Kathapur) Dist. Satara
Repair and Maintenance of Radial gate size 12.479 x 8.224 Mtr- 14 No. and Repair and Maintenance of River Sluice SG and EG gates size 1.9 mtr x 2.44 mtr SG-3 EG-1 no by at Girna Dam Tal. Chalisgaon Dist. Jalgaon.
Repair and general Maintenance, of Mechanical and Electrical components and Refilling of Nitrogen Gas to existing Bladder Vessels of stage 1 and supply, erection of submersible pump for cooling system with change pressure filter cartridges of stage