Loading…
Loading…
5,550 results • Latest
FIXATION OF FLOOD LINE FOR BHIMA RIVER IN SOLAPUR DISTRICT FROM UJANI DAM D/S TO MAHARASHTRA AND KARNATAKA STATE BOUNDARY (CH.310 KM TO 568 KM) , BORI RIVER (CH.43 TO 118 KM) AND THEIR TRIBUTARIES (HYDROLOGICAL STUDY, COMPUTATION OF Flood Level With
FIXATION OF FLOOD LINE FOR MAN RIVER (CH. 100 KM TO 181 KM), KORDA RIVER (CH. 0 KM TO 40 KM), BHOR RIVER (CH. 0 KM TO 52 KM) AND THEIR TRIBUTARIES (HYDROLOGICAL STUDY, COMPUTATION OF MAXIMUM FLOOD LEVEL WITH COMPUTERIZED SYSTEM, MARKING OF PROHIBIT
Renovation of Khora(Weir) M.I Scheme, Block-Gumla,Dist. - Gumla.
Rehabilitation of Veerakondan Eri,Sengalaneer Eri, Vendhankulam, Nochikattiyankulam in Ayangudy, Mudamavadi Eri,Vallavari Peria Eri Mookurinjikulam, Vilankulam ,Pilluvelikulam ,Avudayanikulam Minnamurichan Eri of Aranthangi Tk,Pudukkottai Dt
Krishna Koyna Lift Irrigation Project- Mhaisal Lift Irrigation Scheme- Kavathemahankal Part- Construction of Arag Bedag Lift Irrigation Scheme Tal. Miraj Dist. Sangli and Borgaon Lift irrigation Scheme Tal. Kavathemahankal Dist. Sangli
Construction of nallah from the steps near house of Carol to Amjad Khan House in Ward No.6 Mapusa Municipal Council in Mapusa Constituency.
CONSTRUCTION OF STRUCTURAL REPAIRS, PAINTING AND OTHER MINOR REPAIRS IN REST HOUSE BUILDING NO. 10, FLAT NO. A-4, HAJI ALI, MUMBAI.
Improvement to the nallah from Shri Sarvesh Karpe house to Smt. Kalpana K. Tuenkar house at Salmona V.P. Saligao in Saligao Constituency.
CONSTRUCTION OF INTERNAL ROAD AND MURUM FILLING AT PADASALI PUMP HOUSE OF LIS-2 AND UPGRADATION TO THE LINING ON STAGE I CANAL ESCAPE CANAL TA. NORTH SOLAPUR, DIST. SOLAPUR.
Stabilization of hill slop at Chalta No. 136 P.T. Sheet No. 74 near Shri Uday Chari and Joshi house at Mala in ward No. 21 in Panaji Constituency.