Loading…
Loading…
306 results • Latest
Balance Work of Smart Village-Chapargarh, YEA WC-06
Providing and laying sewerage connection line for STP sector -29 from main trunk line , Yeida
C/O Boundary wall of 01 park in Pocket 2B Sector 18, YEIDA. WC-H
Construction of R.C.C. Drain from Chamad Mata Mandir to Pond and C.C. road from Dr. Rajpal home to pond at Village- Sakka, YEA WC-06
Construction of Both side Carriageway of 120 mtr. wide road Ch. 6.336 km to ch 6.586 km and Ch. 6.836 km to ch 7.051 km Between Sector-16 and 17 at YEA. WC-01
Construction of Laying Interlocking tiles work, Brick/RCC Drain and Road in Village-Chanchali, YEA WC-06
Construction of balance work of 45.00 mtr wide road peripheral road around pocket 7C,7D, pocket 7E in sector 18 yeida WC-03
Strengthening and Resurfacing of Rabupura to Parsol Sampark Marg upto Dankaur-Jhajhar Road and R.C.C. drain in Pachokra main road, YEA. WC-06
Construction of Drainage System along 75.00 mtr. wide peripheral road between Sector- 7 and 8 and 8 and 8 B, YEIDA WC-03
Split Air Conditioner, Ceiling Mount Type (Cassette) (V3) ISI Marked to IS 1391 (Part 2) (Q2), Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))