Loading…
Loading…
6,418 results • Best match
ANNUAL RATES FOR MAINTENANCE AND REPAIRS (ROAD WORK) TA-SAMI, HARIJ & SAN KHESWAR, UNDER JURISDICTION OF R & B (PANCHAYAT) SUB DIVISION SAMI (RE-TENDER)
19 1.00 Cu.M. Demolition including stacking of serviceable 1133.89 Rupees One Thousand Cu.
Annual Maintenance Contract(AMC) of Cab roof mounted AC units of three phase locomotive including replacement of spares for period of 02 years
a-Annual Maintenance Contract(AMC) of Cab roof mounted AC units of
Repair and maintenance of GI tubewell water lines in ward 75 Jama Masjid under EE(C)-14.
Repair and maintenance of GI tubewell water lines
Annual Plan-CLRA GP Pr. No. 275/25-26 Kayiliad No. 26 anganvadi maintenance-Kailiyad Number 26 anganvadi Maintenance-General Civil Work
Work Name:Annual Plan-CLRA GP Pr. No. 275/25-26 Kayiliad No. 26 anganvadi maintenance-Kailiyad Number 26 anganvadi Maintenance-General Civil Work
Annual Maintenance Contract for M/s Statcon Electronics India Limited make Integrated Power Supply (IPS) System installed at various stations in South and DBRP section of Mumbai Division for Three years. .
Annual Maintenance Contract (AMC) of Testing, checking & maintenance of Integrated Power Supply (IPS) system complete mainly consisting of DC -DC converter, 230/110 V 01 transformer, Auto chang over panel, Battery charger, CVT regulator, SMR, Inverter, Manual switch, capacitor, Diode, Fuse trip Indicator, Push button, Resistance, CT Choke, Shunt & Socket, SM's panel, LD's, Air Brake contractors etc of different rating. It includes preventive mainteinance as well as rectification of all type of failures of the system . For the preventive maintenance & failure rectification IPS of Statcon make installed at various stations over Mumbai Division as per Annexure 'A'. (Note - AMC is for THREE years for 72 No of IPS per year (72X36=2592) and the rate mentioned is the rate for per IPS per Month). (Inspection Agency-Cosignee) Above/
Annual Maintenance Contract for M/s Statcon Electronics India Limited make Integrated Power Supply (IPS) System installed at various stations in North and Harbour section of Mumbai Division for Three years.
Annual Maintenance Contract (AMC) of Testing, checking & maintenance of Integrated Power Supply (IPS) system complete mainly consisting of DC -DC converter, 230/110 V 01 transformer, Auto chang over panel, Battery charger, CVT regulator, SMR, Inverter, Manual switch, capacitor, Diode, Fuse trip Indicator, Push button, Resistance, CT Choke, Shunt & Socket, SM's panel, LD's, Air Brake contractors etc of different rating. It includes preventive mainteinance as well as rectification of all type of failures of the system . For the preventive maintenance & failure rectification IPS of Statcon make installed at various stations over Mumbai Division as per Annexure 'A'. (Note - AMC is for THREE years for 67 No of IPS per year (67X36=2412) and the rate mentioned is the rate for per IPS per Month). (Inspection Agency-Cosignee) Above/