Loading…
Loading…
6,394 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; 14 in nos gas cylinder integrated with inflator body and water activated devices of HDLJ operated during normal operation same to be replaced as per sample..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - HIRING THE SERVICES OF TRUCK, TEMPO, CRANE, JCB AND OTHER SERVICES FOR TRANSPORTATION OF VARIOUS MATERIAL/EQUIPMENTS UNDER DGM(T)-EAST-II FOR TWO YEARS; HIRING THE SERVI..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5046AGFabrication work of weather protective shedcanopy on foundations of Boiler side HT and LT motors of Unit 3 4 and 5 GSECL Ukai TPSEMD2; Power House Equipment, As ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - REQUIREMENT OF ALUMINIUM PAINT AND PAINTING WORK FOR 220 KV TRANSMISSION TOWERS UNDER THE JURISDICTION OF DGM (T), O&M-EAST-2; REQUIREMENT OF ALUMINIUM PAINT AND PAINTIN..
Annual Maintenance of Road from Kurki (on SH 76) in Davanagere Taluk to Kulambi (on SH 248) via K.Bullahalli, Hosanayakanahalli, Hadadi, Kanagondanahalli, Nagarasanahalli, and Kengalahalli road from km 0.00 to 2.80, km 5.20 to 8.80, and km 9.27 to 16.51.in Davanagere taluk for the year of 2026-27.
Annual Maintenance of state Highway connecting Gangamula with Kotigehara via Malleshwara, Kalasa and Magundi link road (SH 66) ch 0.00 to 10.00, 17.87 to 25.50, 27.13 to 33.00, 34.50 to 54.00, 55.00 to 63.00, 65.675 to 74.00, 75.00 to 80.00 and 82.00 to 90.73km in Kalasa Taluk. (G)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; AMC for 16 nos of weighing machine and liaisoning with dept of legal metrology for reverification and stamping for 3 years as per scope of work; Buyer
Annual Maintenance of Bridges for year 2026 -27 in Channapatna Taluk Bangalore south district for State Highway-190 Starting from Statehighway-33 to join Hadly circle near national highway-209 via Tubinakere, Aralapura,huluvadi,Byrapatna chakkere, ankushanhalli, krishnapura, iggaluru, Chandapura at Chainage 12.20 km and 11.80 km
COMPREHENSIVE MAINTENANCE AND REPAIR OF ELECTRICALLY OPERATED LIFTS ESCON MAKE INSTALLED AT 300 MEN COMPLEX SIGNAL SCHOOL PAIR OF ELECTRICALLY OPERATED LIFTS INSTALLED AT INHS SANJIVANI ECHS JOC 48 LT CDR BLDG VIRAT BLDG VIKARANT BLDG NIAT
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5229G (TMD-II) Work of inspection, repairing/overhauling of existing piping hangers of Units 3 4 5 during AOH at Ukai TPS; As per Schedule B and scope of work menti..