Loading…
Loading…
6,173 results • Best match
Construction of Compound wall and GI Portable Cabin at Gol bhodi Well near by pass road Cowl Bazaar in Ward No.30, Ballari.
Construction of Compound wall and GI Portable Cabin at Gol bhodi Well near by pass road Cowl Bazaar in Ward No.30, Ballari.
Construction of 33 KV Sub Station Building and Boundary Wall at 04 nos. unroad, chokhala,Hanumanpura, Manihari phanta (Gadra road ).
Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). (B-55/3.2.4)
Repair and Maintenance of Infrastructure assets in R-II Division during 2025-26. SH - Repair of footpath and boundary wall near AB 77, Shahjahan Road.
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)
Construction of Control room building, boundary wall, RCC Cable trench, Drain, Fencing and pathway for proposed 33 11 KV PSS, Barabanki under Mango Division
Construction of Control room building, boundary wall, RCC Cable trench, Drain, Fencing and pathway for proposed 33/11 KV P/S/S, Barabanki under Mango Division.
Proposed construction of compound wall and storm water drain at the south-east corner of Mandara housing complex, CB campus Bangalore
Providing and construction Solid CementConcrete Block masonry in cement mortar 1:6 (Cement : fine aggregate as per IS: 2116) using factory made, load bearing, approved quality, Grade C (4.0), as per IS: 2185 (Part 1), density of blocks not less than 1800kg/cum, minimum average compressive strength of units 4.0N/mm² at 28 days and minimum strength of individual unit is 3.2N/mm², set to level plumb including setting in position, providing scaffolding, curing, raking out joints wherever necessary etc., complete with all leads and all as per specification and direction of Engineer-in-charge in SUPERSTRUCTURE UPTO FLOOR FIVE LEVEL. For 200mm thick walls using (400x200x200)mm size blocks {Using fine aggregate (Crushed stone sand produced by crushed hard stone / rock as per IS: 2116)}
Providing chain link mesh and Construction of compound wall at A block graveyard and teakymajidgraveyard inkanchanbagh ward -71 - Rs. 11.00 Lakhs