Loading…
Loading…
6,043 results • Best match
Urgent Protection and Restoration of the Damaged Existing Retaining Wall on the Right Bank of Muvattupuzha River at Attutheeram Park, Piravom Municipality
60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site.
Construction of Bus Stand at Lakkar Bazar Shimla Distt. HP (SH Balance work of Retaining wall below approach road to parking floor etc.)
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Restoration of Rain Damages on Kandu Panjoh ( upper) road Km. 0/0 to 3/560(SH Construction of PCC Retaining wall with Pusta at RD 0/910 to 0/925)
Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetera in all type of classification of soil, comprising of ordinary soil, ordinary rock , hard rock chiseling / wedging out rocks (where blasting is prohibited) as per drawings and MORD technical specification clause 305.1 and as per the directions of the Engineer-in-Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavated suitable / approved materials to the original surface in layers not exceeding 150mm one hundred fifty millimeters) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
as per BOQ
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
REPAIR TO COMPOUND WALL FENCING GATE PATH AND DRAIN IN ZONE D AREA UNDER AGE (I) AYODHYA CANTT
S&F in repairs galvanised 2 strand , steel barbed wire 2.24 mm dia barbed with 2 mm dia barbs at 75 mm spacings and straining and fixing to any type of standard rails straining bolt, including, securing or tying at crossings with and provision of galvanised mild steel wire, staples or steel pins, etc as directed (each line wire to be measured) ,complete all as specified and as directed by the Engr-in-charge.
1. Balance work of approach road and retaining wall for closure of LC gate no 33A on Sewagram-Ballarshah section. 2. Balance work of approach road, retaining wall and drainage arrangement for closure of LC gate no.11 on Sewagram-Ballarshah section. ... and retaining wall ... retaining wall for ... 4. Construction of ...
5.9.16 Edges of slabs and breaks in floors and walls