Loading…
Loading…
32,017 results • Best match
Construction of Boundary wall including demolition and reconstruction of existing damaged portion of compound wall for C-DOT at Electronics City, Bangalore.
1 Construction of Boundary wall including demolition and reconstruction of existing damaged portion of compound wall for C-DOT at Electronics City, Bangalore. 15608843 Below 15.3 13220690.021
REPAIR TO BOUNDARY WALL RETAINING WALL DRAINAGE COMPOUND WALL AND CERTAIN BR WKS ZONE A UNDER GE ARMY DHAR ROAD
Extra over stone walling for hammer dressing to face stones and dressing of face beds and joints, as specified, of random rubble walling, uncoursed or brought upto courses. Hammer dressing witrh maximum depression on face from straight edge held against the dressed surface not exc 20 mm in lime or sand stone complete all as specified and directed
Earthwork excavation PCC RCC Steel work in built up tubular section Centering and shuttering Painting with synthetic enamel paint Random rubble masonry Dryrubble masonry Steel reinforcement for R.C.C work Laterite masonry Plastering Fencing
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :-Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
Earthwork excavation PCC RCC Dry rubble masonry Random rubble masonry Centering and shuttering Laterate masonry plastering Fencing with angle iron post Finishing with Deluxe Multi surface paint Steel work in built up tubular section Painting
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
Attending repairs and face lifting to the Northern block and Re-construction of compound wall at Southwest boundary in Government High School, Thiruvettakudy in Kottucherry commune, Karaikal.
Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content - with water thinnable cement primer on wall surface having VOC content less than 50 grams / litre
REPAIR TO FENCING BOUNDARY WALL RETAINING WALLS AND MISC BR WORKS OF SECTOR A AT LEH UNDER AGE BR II OF GE 865 EWS
M&L Factory made Prestressed cement concrete compound wall pillar having length 2.40 m having top & bottom dimension 150 mmx150mm with grove of 60 mm for slab fitting reinforced with 6 nos 4 mm HT wire fitted with two hooks of 6 mm for lifting incl demolation complete all as specified.