Loading…
Loading…
3,948 results • Best match
Repairing of Patch work with Milling At Existing Bridges carriageway in Bridge Project of Ahmedabad municipal Corporation.(A.R.C.)
the safety of the roads/ bridges. All such works should be approved by the Engineer in
DEPOSIT-KRFB-Utility shifting works for KIIFB-2017-18-Construction of Thriprayar bridge across Canoli canal in Cherpu Thriprayar road of Nattika LAC- Laying of 75 mm PVC Pipeline in Replacement of Existing Line and Shifting existing WSC
Working Charges
Vengallor Bridge URGENT maintenance works for protecting the foundation of Vengalloor Bridge in Thodupuzha LAC
OD74438/2025-2026: Microconcrete Reinstatement for thickness more than 50mm for RCC members: Providing and laying of special repair material micro-concrete for reinstatement of members having thickness of repair more than 50mm and jacketing, using Single component, high strength, high flow cementitious micro-concrete having compressive strength minimum of M40 at 28 days such as MasterEmaco 346 or Renderoc RGL / RGS of Fosroc or equivalent, blended with washed saturated surface-dry (SSD), graded, low absorption, high density, aggregates of size 3mm to 10mm at 50% by weight of micro concrete (if thickness is 100mm or more) and water as per data sheet and pouring into the shuttering if required than use birds beak type form work using suitable arrangement or if required using pumping device for uniform flow of Microconcrete. The side shuttering can be removed after Minimum of 24 hours, preferably 3 days and the bottom shuttering after 7 days ensuring proper bond between the micro concrete and existing concrete substrate at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant. (Payment shall be made in Sq.M for thickness upto 100mm of Microconcrete of area repaired, ) including shuttering work (Only steel reinforcement shall be paid in other relevant items)
Etawah district in financial year 2025-26 work of new construction of 5x6.00x5.00 m span RCC (box culvert) minor bridge, approach road and additional approach road on Sirsa river from Bibamau (Manikpur) to village Mahamai
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with
Strengthening work of Raisalpur Ridhodakheda Bamhangaon road, Length 4.33 Km under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 200.62 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Strengthening work of Raisalpur Ridhodakheda Bamhangaon road, Length 4.33 Km under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 200.62 Lacs on Road & Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Strengthening work of Bagra to Naya Ghodanal, Parsapani, Mahendrawadi, Churna, Kakri, Bori, Naya Sankai, Naya Kajri, Pathrai road under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 124.99 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto da
Strengthening work of Bagra to Naya Ghodanal, Parsapani, Mahendrawadi, Churna, Kakri, Bori, Naya Sankai, Naya Kajri, Pathrai road under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 124.99 Lacs on Road & Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.