Loading…
Loading…
3,949 results • Best match
GENERAL Karinkuzhi Side Protection Side Protection works on Us Ds of Karinkuzhi VCB cum bridge in Kankole Alapadampa Panchayath in Payyannur Constituency Kannur District General Civil Work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
RECONSTRUCTION OF MAJOR & MINOR BRIDGES ON BILIMORA-CHIKHLI-VANSDA-WAGHAI ROAD KM. 1/4 TO 41/2 & KM. 44/4 TO 59/6 (W.S. KM. 26/6 TO 26/8 RHS - MAJOR BRIDGE ON KAVERI RIVER, KM. 39/2 TO 39/4 LHS - MINOR BRIDGE ON KAVERI RIVER AND KM. 45/0 TO 45/2 RHS ... MINOR BRIDGE ON ...
and where directed. (A) RCC Work
Construction of Entry/ Exit Structures integrated with Commercial Spaces and connecting through Link Bridge at Sholinganallur Station including Civil,Plumbing, E M, HVAC, Archit Finishes and all associated works asper drawingsat Chennai,TN
Work to be executed under Specofic Provisional Sum: This will be operated for the following items: Construction of (a) Architectural work, block work and finishes, (b) Boundary wall integrated with Storm Water Drain(SWD), ( c) Internal & external drainage, plumbing and Sanitary, fittings and accessories, (d) signages, (e) Entry Arch, Gate and Security office, Boom barrier and checkpoint, (f) Landscaping and irrigation system, (g) Gratings and drain cover, (h0 facade for building and link bridge, (i) Other Miscallaneous work & For common areas like staircase, lift lobby & toilet areas at all levels full finishes to internal & external area walls, Flooring etc, water supply, sanitary and draingage services and all necessary fitting to be made. Payment shall be made as per actual work executed by the contractor and rate shall be as per DSR / DAR civil 2013 excluding GST and after deducting 7.0% from DSR Rates towards B AND R"s udual over heads, will be adopted for these works ( NO Chennai factor shall be applicable for the works under this category)
Construction of Bankhedi Umardha Mathni Sandiya road, Length 3.10 Km. under P.W.D. Sub Division, Pipariya. 1st Call, PAC Rs. 286.78 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Construction of Bankhedi Umardha Mathni Sandiya road, Length 3.10 Km. under P.W.D. Sub Division, Pipariya. 1st Call, PAC Rs. 286.78 Lacs on Road & Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Strengthening work of Shivpur Talkesri road under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 220.25 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Strengthening work of Shivpur Talkesri road under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 220.25 Lacs on Road & Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Strengthening work of Ajneri to Jhiramta road under P.W.D. Sub Dn. Pipariya. 1st Call, PAC Rs. 189.84 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Strengthening work of Ajneri to Jhiramta road under P.W.D. Sub Dn. Pipariya. 1st Call, PAC Rs. 189.84 Lacs on Road & Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.