Loading…
Loading…
3,949 results • Best match
GENERAL-Bridge Safety work - Pashnithodu Bridge-Bridge Safety work for Pashnithodu bridge in approach road.-General Civil Work
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
Repairs to road from Kolad RUB to Kundalika II bridge parallel to the track at km10/3-10/8 in between Roha - Kolad section under SSE/Works/CHI Section in Ratnagiri Region of Konkan Railway in the State of Maharashtra
4.3Centering and shuttering including strutting, propping etc. and removal of form work for: 4.3.2Retaining walls, return walls, walls (any thickness) including attached pilasters, butresses, plinths and string courses fillets curbs and steps etc.
Construction of balance work of 53.41 Mtr span 10.37 Mtr each RCCslab bridge over Jabbar Khad at Lateri to connect village Dhug in Tehsil Nurpur Distt Kangra H.P
Excavation for structures ( Earth work in foundation of structures as per dawing and technical specifications , including setting out , construction of shoring and bracing ,removal of stumps and other deleterious matter, dressing in sides and bottom and backing filling with approved materials Ordinary soil as per the directions of the Engineer-in-Charge, including carriage of materials within all leads and lifts and other incidental charges. The rates are includes of royalty, octroi, toll tax and all other charges as imposed by the Government but excluding G.S.T.
Construction of Bridge Work on the route Connecting Yalpi, Kaggalu, and Lingadevanahalli in Ballari Taluk, Ballari Rural Assembly Constituency Under 5054-KRDCL Capital Expenditure for the year 2026-27.
This is to certify that M/s. ………………………….. is a reputed company with a good financial standing. If the contract for this work, namely.................................................................................... (Name of the work) is awarded to the above firm, we shall be able to provide overdraft/credit facilities to the extent of Rs. …………....../- (inwards) .................................................................... ..... to meet the working capital requirements for executing the above contract
Brahmani Bridge at 22.70 Km of Kaichor Nandigram Singhi Road, Repair and Rehabilitation work (Phase-1) under Katwa Highway Sub-Division of Burdwan North Highway Division in the district of Purba Bardhaman during the year 2026-27.
Providing and laying Mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29 using approved coarse aggregate, fine aggregate, filler material and bitumen, prepared by using Mastic cooker including cost and carriage of all ingredients, cost of heating aggregates and binder, mixing in specified proportions conforming to approved Job Mix Formula and laid to required level and slope after cleaning the surface, compacting, sealing the construction joints and surface finishing conforming to specifications including providing antiskid surface with bitumen pre-coated fine-grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005 cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 100°C, protruding 1 mm to 4 mm over mastic surface, including the hire charges of all tools and plants and machinery, pay of operators, cost of fuel and lubricants and all other incidental charges and quality control all complete as per Clause 516 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) 25 mm thickness
Repair and maintenance of Odumbra Bridge -Repair and maintenance of Odumbra Bridge in Kozhikode District
OD194935/2024-2025:Microconcrete Reinstatement for thickness more than 50mm for RCC members:- Providing and laying of special repair material micro-concrete for reinstatement of members having thickness of repair more than 50mm and jacketing, using Single component, high strength, high flow cementitious micro-concrete having compressive strength minimum of M40 at 28 days such as MasterEmaco 346 or Renderoc RGL / RGS of Fosroc or equivalent, blended with washed saturated surface-dry (SSD), graded, low absorption, high density, aggregates of size 3mm to 10mm at 50% by weight of micro concrete (if thickness is 100mm or more) and water as per data sheet and pouring into the shuttering if required than use birds beak type form work using suitable arrangement or if required using pumping device for uniform flow of Microconcrete. The side shuttering can be removed after Minimum of 24 hours, preferably 3 days and the bottom shuttering after 7 days ensuring proper bond between the micro concrete and existing concrete substrate at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant. (Payment shall be made in Sq.M for thickness upto 100mm of Microconcrete of area repaired, ) including shuttering work (Only steel reinforcement shall be paid in other relevant items)