Loading…
Loading…
3,949 results • Best match
Construction Work Approach Road, Add. Approach Road and Protection Work At Sai River Bridge On Singhni-Ladwat Marg In Distt Pratapgarh on SBD Mode under unit bcu sultanpur
Approach Road:- Construction of Embankment with Material obtained from Borrowpits: Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table Morth Specifation 305 S.No 3.16
GENERAL Urgent maintenance woks in Mankomb Civilstation Bridge Approach Road Urgent Rectification works in approach road due to settlement General Civil Work
OD20683/2026-2027:Construction of Embankment with Material obtained from Borrow pits :- Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of Divider beautification work on NH 11 Bridge wall to municipal council office choraha via PWD office, rest house and police station at Phalodi
Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Dismantling Brick / Tile work In cement mortar
Signalling work in connection with Construction of new ROB at Prabhadevi station (Elphinston Road- Carol bridge) at Km 8-9 by MRIDCL of Mumbai Division Western Railway.
Excavation of cable trench as per cable route plan, 1 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr wide advised by Engineer-in-charge alongside the track in normal (all type) soil/strata, conforming to distances as per cable route plan and refilling. This work includes clearing of route 1 from bushes etc., covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on Western Railway and instructions of Railway Engineer at site. In case 1m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1m.
Construction of flood protection works on Kahal Jugasar near Butt Market dstream LHS of Nallah FPW at diggi Dudwar on Kahal Jugasar Nallah FPW on Kahal Jugasar Nallah near changa Tawaie bridge at spot and Construction of flood protection works
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 1 All kinds of soil 70% 2.Ordinary Rock 30%
Maintenance work of (Drain cleaning, grass cleaning, Kerb stone repair, painting, road marking and other allied work) at 130m wide road from Hindon Bridge to (U-turn) after Iteda rotary for three years, Greater Noida.
Supplying at site : R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-incharge (cost of earth works in excavation, concrete works in foundation to be paid separately). (DSR-18/16.15.1)