Loading…
Loading…
3,949 results • Best match
CONSTRUCTION OF BRIDGE OVER RIVER BIRMA, APPROACH ROAD, ADDITIONAL APPROACH ROAD AND PROTECTION WORK ON GADAURA- KANORA MARG IN DISTT MAHOBA
Foundation Providing and Constructing Temporary Island 24 m diameter for Construction of Well Foundation for 8 m dia. Well.
Shifting of 11 KV Bhikampali Feeder from H.L Bridge at Pujariapli Ghat under ESO Panchgaon under SDO Belpahar for the work Construction of H.L. Bridge Over River Mahanadi at Pujaripalli Ghat connecting to Jarimuli under CRIF on Turnkey Basis
Construction of earthing chamber including installation of earthing pipe making earthing chamber including excavation, soil teratment with bentonide powder, calculation of earth resistance including installation of 3 mtr GI pipe 40mm/30mm including weilding of flat GI around pipe as per the specification of TPWODL including handing over of the same to TPWODL complete in all respect
Construction of Bridge along with approach_additional approach and protection work Over River Maskrarao on Nathmalpur to Firozabad Village road in Distt Saharanpur
Providing and construction Temporary Island 24m diameter for Construction of Well Foundation. Making of Island (1m)
GENERAL-Investigation work-Investigation work for the construction ofMuthalamoorkhankadavu suspension bridge across Kunthippuzha connecting Vellinezhi panchayat in Shoranur LAC and Karimbuzha panchayat in Ottapalam LAC in Palakkad
56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
CONSTRUCTION OF BRIDGE OVER RIVER KALI, APPROACH ROAD AND PROTECTION WORK AT VILLAGE JHANDA MUSHARRAFPUR ROAD TO SAIDPUR ROAD IN DISTRICT HAPUR
Construction of Granular Sub-Base (G.S.B.) by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
Engineering Procurment and Construction of a bridge over the Ramganga River approach roads and protection works on the Aonla Aliganj Gaini Dauli Raghuvar Dayal Road in District Bareilly UP
Engineering, Procurment and Construction of a bridge over the Ramganga River, approach roads, and protection works on the Aonla–Aliganj–Gaini–Dauli–Raghuvar Dayal Road in District Bareilly., U.P