Loading…
Loading…
3,948 results • Best match
GENERAL Bridge Safety Bridge Safety 2025 2026 In Mannar Section General Civil Work
Bridge Safety Works
CONSULTANCY SERVICES FOR TECHNICAL AUDIT AND QUALITY ASSURANCE AND CARRYING OUT THE SAFETY AUDIT AS PER IRC MORTH GUIDELINES FOR THE WORK OF CONSTRUCTION OF MAJOR BRIDGE ACROSS BANAS RIVER ON MALGADH DOLIVAS ROAD TA.DEESA DIST. BANASKANTHA.
5.2 Bid Security i.e. EMD for works as mentioned in 2.0 A shall be in the form of
Strengthening work of Shobhapur Hanuman Madhiya to Kumhabad road upto Bhoukhedi under P.W.D. Sub Dn. Pipariya. 1st Call, PAC Rs. 151.95 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Strengthening work of Shobhapur Hanuman Madhiya to Kumhabad road upto Bhoukhedi under P.W.D. Sub Dn. Pipariya. 1st Call, PAC Rs. 151.95 Lacs on Road & Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
GENERAL-Aroor - Edakochi Bridge - Urgent Maintenance- Balance work of Aroor Edakochi Bridge .Approach road patch work.- General Civil Work
OD44066/2026-2027:Engaging man mazdoor for clearing silt from the deck slab of bridge, vegetation growth of sub structure, hand rails etc complete.
GENERAL- Rehabilitation of Kuriyappilly bridge bridge in North Paravur Constituency in Ernakulam District- Bridge Safety- Rehabilitation of Kuriyappilly bridge -General Civil Work
OD267730/2025-2026:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
Construction work of a drain and cement concrete road from Shankar to Wasim house on Ward No. 06 Moh. Azad Road, from Haroon to Chaman house, and from the mosque bridge to Akbar house. (Length 111.40, Width 3.10)
Dismantling brick work or Stone Work including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet).