Loading…
Loading…
4,017 results • Best match
Rehabilitation, special strengthining and Repair of Bridges work (ROB LC- 260 Distt. Indore, wana river bridge distt. khandwa , mahi river bridge distt. ratlam and shivna river bridge distt. mandsaur)(Group-1)
Rihabilitation, special Strengthining and Repair of Bridges work (ROB LC-260 Distt. Indore, Wana river Bridge Distt. Khandwa, Mahi river Bridge Distt. Ratlam and Shivna river Bridge Distt. Mandsaur) (Group-I)
GENERAL Investigation work for the construction of Munnattumukham Bridge in Kuttanadau LAC in Alappuzha District Investigation work for the construction of Munnattumukham Bridge in Kuttanadau LACin Alappuzha District Investigation Work
56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
Special Repairs Work for Mahanadi River Bridge on Sheorinarayan-Gidhauri Road Under Sub Division Janjgir.
Removal of existing cement concrete wearing coat including its disposal complete as per Technical specification without causing any detrimental effect to any part of the bridge structure and removal of dismantled material with all lifts and lead upto 1000m as per section 2809.
KSWMP Project No 94 23 24 Construction of Weigh Bridge at ward 27 of Trenching Ground Construction of Weigh Bridge General Civil Work
CONSTRUCTION OF CONTROL ROOM FOR WEIGH BRIDGE
Ordinary Repair work of Various Roads and Bridge Culverts under PWD Sub Division Kunkuri
Construction of drain from bridge to Power House Gate and allied works CHEP I
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil