Loading…
Loading…
15,857 results • Best match
Repairing works of Rest Shed at Teesta Bridge Construction sub Division- II Haldibari Under Teesta Bridge Construction Division PWD MekhliganjCoochBehar during the year 2024 2025
Repair works for the approach road and protective structures of the minor bridge over the local drain located at Km 1 on the Dhanapur Besan Ka Purwa road in District Amethi
Construction of K & C drain on both side of patries with cement concrete 1:4:8 (Cement , sand and 40 mm guage brick ballast), M-150 brick work in 1:3 cement and coarse sand mortar and finished with struck pointing 1:2 cement and fine sand mortar including supply of all materials, labour T&P etc complete as required for proper completion of the work.
Construction work of sodalpur to soutada rd Length 5.55 km PAC 575.83 lacs First Call on Road and Bridge SOR 11-04-25 work period 180 days
Construction work of sodalpur to soutada rd Length 5.55 km PAC 575.83 lacs First Call on Road and Bridge SOR 11-04-25 work period 180 days
In the financial year 2025-26, work of New Construction of the road from Garhi Kalanjari to the approach road of the bridge in district Baghpat
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge
Construction, maintenance, dismantling and transportation work of the approach road to the pontoon bridge on Ganga river from (District Kanpur Nagar) to Shuklaganj (District Unnao)
Maintenance of Pontoon bridge including pile on either side from start to end including tightening of nuts, bolts of pontoons & railing posts, repair of Kansa Poola and Kapsa soil, maintenance of Chequered plates, watering of way of Pontoon bridge and supervision of nut, bolts of Pontoons and fixing of nut, bolts removing damaged nut blots and tightening of ropes and watch and ward of camp and Pontoon bridge and other work as per direction of E/I.
Geotechnical Investigation work in connection with the work of Proposed construction of IRC Class A RCC Bridge over Ichhamati River at Jhupa Ghoshpara Ghat near Benimadhabtala (2nd Call)