Loading…
Loading…
28,270 results • Best match
CONSTRUCTION OF CONCRETE PATH FROM BRIDGE TO UPWARDS AT MANTHNA AND CONST OF DRAIN FROM LAND OF ASADULLAH AZIZ TO ON WARDS WARD 4 UNDER ADP(PRI) GRANTS FOR YEAR 2025-26 ,P/H BIJHAMA A BLOCK -BIJHAMA
CE/EAP/ARRBP/OCB/Bridge-1/Karbi-Anglong/16A Construction of Bridge in Karbi-Anglong district i) Br. No. 1/1 on Road from 15th KM of DM Road near Kanch office to Hidim Teron Village
Wooden Bridge Diversion Construction of cold weather Bamboo bridge ...
RMO of electrical and mechanical installations on PWD roads in East District under M-253 New Delhi during 2026-27 Replacement of damaged street light poles at Yamuna Bridge Vikas Marg and other associated work under Sub-Division M-2532)
M/R To bank protection work from the House of Satya Charan Das at ch 5340.00m towards Pujali Bridge( Ch.5700.00m) on the Right Bank of Charial Diversion Khal within Pujali Municipality,P.S.-Pujali,Dist. South 24 Parganas,under SDD
Work of installation of 49 nos. 8mtrs long HDGI octagonal poles along Telaulim Varca bridge road at Baichowado from children park upto River Sal as per the request of village panchayat Telaulim, Salcette Goa within the jurisdiction of Sub-Division-II
Construction
Emergent Restoration of Wooden Bridge over Maja Damodar at Hariharpur, Debipur Kamarpara and Roychak for a length of 22 m, 37 m and 30 m in connection with Flood Protection and mitigation work and reducing vulnerability of people in G P-Kurchi
STBR/SOPD-G/Tinsukia/01 Construction of RCC Bridge No. 1/1 over Lakhimi Nala on Hospital Chariali to Tupsina Ghat Road at ch.0.4 km under Tinsukia, Doomdooma, Makum and Sadiya Territorial Road Division, Tinsukia District
Urgent realignment of existing 350mm dia distribution main from Swadeshi Mill OHT and 150mm dia pumping main to enable construction of road over bridge across level crossing No.45 (AFT Mill Gate) between Villupuram and Puducherry Section.
Construction of a Minor Bridge along with approach road on Walki Aashti Kandli Parwa NH 161 A Takrala to Taluka Border Road SH 417 km 33/100 (Old MDR 12 Km 16/200) Dist Nanded Tq. Himayatnagar
Construction of Elevated road,Flyover at Argora chowk from Harmu, Near KAVs Restaurant to Dibdih bridge, Near Sailors Knot Restaurant with legs towards Kathal more Chaputoli and towards Ashok nagar, Near road no.-3 including service road
Construction of a minor bridge at Km 13 of the Khanpur Siwalkhas Jani Tikri Rasulpur Modinagar road (Other District Road) situated between Patla (located on the GMBS Raghunathpur Modinagar road) and the aforementioned route in the district of Meerut
Construction of a road connecting the underpass near the police outpost situated close to Moradabad Kashipur State Highway 737 to the vicinity of the Dhela River bridge, passing along the northern side of Jalalpur and Tugadia villages (Block Dilari).
Shifting and erection of 25 kva Substation, 3ph 3w 11 kv and 3ph 4w LT line due to Construction of HL Bridge over Chanagudi Nallah at 19/150 km on Kaintragarh Doruha Road for the year 2025-26.
Construction of Approach Road and Gabion Wall to Jor Wai Pachwad Road MDR-19 Km 2/900 to 2/990 to 2/990 and 3/010 to 3/100 at Minor Bridge on Krishna River Tal.Wai Dist. Satara
Restoration of Rain damages of LWSS Arki in Tehsil Arki District Solan HP SH_ Construction of foot over bridge by dismantled GI Pipe over Arki Khad for approach to the pump house of LWSS Arki Town Under NDRF
Engineering, Procurment and Construction (EPC) of 02 lane rail over bridge on railway crossing no. 248A/special at km 244/3-244/4 of Kasganj-Farrukhabad rail section on Kasganj to Amapur, Sidhpura road in District- Kasganj, U.P.
Flood Precautionery Measures (F.P.M.) work of both embankment of Kana Damodar from Munsirhat Bridge to telihati including sluice sealing of three nos sluices on R/B of River Kana Damodar in Block - J B Pur , P.S. - J B Pur, Dist. - Howrah
Short Term Maintenance work (STMC) from km 0.00 (Sevoke Army Cantonment) to km 14.00 (Sevoke Coronation bridge) including spot improvements on NH-10 (Sevoke-Rangpo section) in the State of West Bengal on Item Rate Basis during the FY 2025-26
Restoration of roads under the jurisdiction of PMGSY Division Budhal on emergency basis (Motorable path only) by way of clearance of Snow, slips/crate work likely to be occurred during the financial year 2026-27 on 1. Sora Bridge to Khablan, Pkg
Under Vasundhara Zone, work of closing the cuts by barricading for the smooth movement of the pilgrims of Kavad Yatra 2026 on the route from Hindon River Railway Underpass to Khoda UP Gate and from Link Road Sahibabad Over Bridge to UP Gate.
In view of the Kavad Yatra under the City Zone, barricading work is being done from Mahamaya Flyover to Hindon Bridge, barricading in Sai Temple Complex and to close the cuts at places like Rajnagar Extension Square to Meerut Tiraha on Meerut Road.
SH C O Sub Structure Super structure and both side approaches
Cutting dangerous trees and tree branches Cutting trees in Irrigation land near Oldcut canal and Kalamthiruthi Bridge -in Nannambra Panchayath in Malappuram District-
(SH Geo tech investigation)
Construction
Construction of C.C. Road from the H/O Akbar Mia towards the H/O Ekramul Hossain near Baburhat Bridge Booth No. 8/140 at Nilkuthi Baburhat mouza within Guriahati-I G.P. under Cooch Behar-I Panchayat Samity
MMPPNA RIDF XXXI 25 26 130 Construction of road from (i) Clever House Bridge to Borobil Road (Ch. 0.00m to Ch. 1000.00m) (ii) NH-54 to Boaljur Nallah via Murtakhaler par (Ch 1000.00m to 2300.00m) (iii) Kazidahar
NIT NO. 06/EE(R-III)/ 2026-27
Repair and maintenance of Pandoga Khad bridge at RD 5/904 to 6/155 on Panjawar Bathri road Km 0/0 to 347/00 SH P/L M-25 Jacting, PCC 1 3 6, wire crate, stone flooring etc at RD 5/904 to 6/00
Maintenance Repair of 3(three) nos Wooden Bridge at Ch.10830.00 mtr over S.AM.D (P-1) at Molonga in G.P-South Garia, in Baruipur Block, at Ch.6135.00 mtr over S.AM.D (P-1) Rampur in G.P-Sonarpur-II ,P.S Block Sonarpur, and at Ch.3890.00 mtr over
Construction / Upgradation of Road/ CD works including maintenance for Five Year after construction. RBR-Bridges
Road/Bridge Work
Construction / Upgradation of Road/ CD works including maintenance for Five Year after construction. RBR-Bridges
Road/Bridge Work
Reconstruction of Old Minor Bridge Banda Amboli Ghat at CH. 38.850 and Construction of Retaining wall And other safety measures in ghat portion in km 00.00 to 47.800 Section NH.548H in the Sindhudurg District Ta.Sawantwadi Dist. Sindhudurg .in
GENERAL-Premonsoon 2026 - 2027-Urgent ordinary repairs to various bridges under Bridges Section Muvattupuzha-General Civil Work
... 2026 - 2027-Urgent ordinary repairs to various bridges under Bridges Section Muvattupuzha-General ...
Zonal Work (अध्यक्ष , पार्षद निधि एवं अन्य मद अंतर्गत रु. 1.50 लाख तक के छोटे छोटे निर्माण/मरम्मत कार्य) (CGPWD BUILDING SOR 2026, ELECTRICAL SOR 2020 , ROAD/BRIDGE SOR 2025, PHE SOR 2020) at ward number 01-15 KUNKURI
Package no CE/EAP/ARRBP/OCB/Bridges-3/Sonitpur/08 Construction of Bridge in Sonitpur district i) Br. No. 1/1 on 6 No. Gormora to Amloga Road ii) Br. No.2/1 on Dhuna Bakari in Chengamari connecting road iii) Br. No. 1/1 on Nagapathar Dholapadung Road
... MORTS&H specification of bridge works.) iii) Br. No. 1/1 on Nagapathar ...
SW-I ) "Annual Zonal Contract - Alongside the Railway track yard from Krishna Bridge (i.e.,) Km.425/27-A for West line and Km.425/27-A for East line to Km.431/6&7 for both slow & fast lines towards Visakhapatnam side and upto Km.569/0-1 towards ... track works upto ... - Repairs and ... SSE/ Works /WA/BZA ...
MH 3426 Construction and Maintenance of Submersible Bridge A) Bhavarpada Ch 3/160 B) Mahalpada Ch 1/215 C) Koharlipada at CH 1/290 D) Daudpada at CH 2/78 E) Dongaripada Ch 2/210 Tal. Dahanu Dist Palghar
Construction of Submersible Bridge SH-73 to Bandhghar Nimbapur Bohepada to SH-73 road Near Bhavarpada @ Ch 3/160 Tal. Dahanu Dist Palghar
Construction / Upgradation of Road/ CD works including maintenance for Five Year after construction. RBR-Bridges
Road/Bridge Work
Construction of Bridge on Telangan border,Yanagundi to NH-150 up to Jewargi Road SH 173 KM 66.40 in Chittapur town limit,Chittapur Taluka,Dist Kalaburagi. Under 5054-80-190-0-01-132 (KRDCL) Capital Expenditure for the year 2025-26.
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Additional Construction of retaining wall to bridge of road from SH-74 (Near Nandi Village) to join Andra Border (SH Road) via Vijayapura-Sidlaghatta, Dibburhalli, EThimmasandra, Palyakere & Chelur road at Ch25.52 Km in SidlaghattaTaluk Chikkaballapur Dist (Reserved for CAT-2A category)
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Construction of RCC foot bridge over branch of Bijoy River near Naru Miah land to Adul Kalam Azad pond under Gazaria GP, Bishalgarh RD Block, Sepahijala District, Tripura during the financial year 2026-27. (PWD SoR 2023).
APPOINTMENT OF PROJECT MANAGEMENT CONSULTANT FOR CONSTRUCTION OF HIGH-LEVEL LONG BRIDGE OVER UJANI DAM BACKWATER, OVER BARAMATI LAKADI KALAS CHANDGAON ROAD MDR-65 FROM CHANDGAON, TAL. INDAPUR, DIST. PUNE TO POMALWADI OVER MDR-124, TAL. KARMALA
Strengthening of Road from Gulmohar Canal to Indus Centre Point (Near Akriti Eco City) Road - Length 2.40 Km. .) PAC 951.72 Lacs Second call on Road and Bridge S.O.R. wef 11-04-25 Work Period 300 days i/c rainy season
PBMC of Sumer Hathiyakhedi upto Bhadarwada Gaon length 7.64 km. and various roads total length 22.24 km. PAC RS. 777.79 LACS First call on on Road and Bridge S.O.R. wef 11-04-25 Work Period 1825 days i/c rainy season
DESIGN AND CONSTRUCTION OF 65 MTR SPAN MAJOR PMT BRIDGE WITH STEEL SUPERSTRUCTURE THROUGH TYPE OPEN FOUNDATION AT KM 2.10 ON TIDANG-BIDANG ROAD UNDER 67 RCC/765 BRTF/CE (P) HIRAK IN UTTARAKHAND STATE ON EPC MODE
Construction of foot bridge across nallah tributary over banks including strengthening and beautifying the guide walls of nallah on either side rejuvenation of fresh water bodies at upper bazaar behind market complex Ponda taluka (Re-Tender) 2nd cal
Construction / Upgradation of Road/ CD works including maintenance for Five Year after construction. RBR-Bridges
Construction of Bridge Under (Reconstruction of Damaged Bridge Scheme -1634) Package No. MP21RBR04 (Offer Based on MP PWD SOR 11.04.2025) as per detailed BOQ attached in Annex-II A.