Loading…
Loading…
2,449 results • Best match
Special repairing to the EI work including urgent Shifting of Old-Floor level 3Ph BBC to another place and rerouting of existing PP connection at SNCU, Arambagh, PCSGMCH(Electrical Work).
Laying of cable as below, on existing Cable Tray and binding with suitable size GI wire.
REPAIR / MAINTENANCE TO HT OVERHEAD DISTRIBUTION ON SYSTEM 11KV LINE OF E/M SERVICES, HT VCB/GO/DO OF 11KV AND CONNECTED WORKS AT MIL STN UDAIPUR UNDER AGE (I) UDAIPUR
Excavation in trenches not exc 1.5 mtr wide and not exc 1.5 m in depth in a hard/dense soil for laying underground cables/ errection of steel tubular poles / stay pit etc complete all as specified and directed by Engr-in-charges.
Construction of new 33/11 KV (2x5 MVA) Sub-Station Kuadanda Dhimani and its associates 33 KV and 11 KV lines under EDC, Bareilly
Laying of 11KV cable of different size from power T/F to control room I/C and control room to D/P outside Sub-Station over a pad of river sand . Cable shall be laid 500mm below the ground in the yard by covering three sides with Ist Class brick and Ganga sand (All type laying material will be provided by the Firm except 11 KV cables ).
Additional work in connection with proposed 50 bedded Critical Care Block G3 Storied at North Bengal Medical College Siliguri Electrical Works S.I.T.C of Substation.
Laying of two cables above 185 sqmm in an underground trench in single tier formation (horizontal), the trench size : 680 mm x 760 mm average depth, with brick protection on the top of each cable 8 (eight) Nos. bricks per Mtr. and 4 (four) Nos. bricks per Mtr. as separator between the bricks and cables and also trench to be filled up with shifted soil, levelling up and restoring surface duly rammed
PROVISION OF 01 X 30 KVA GENR WITH CONNECTED ITEMS AS STANDBY POWER REQUIREMENTS FOR SEWAGE TREATMENT PLANT UNDER AGE (I) BHALRA
Sand cushoning to underground ground cable in layers of 23cm thick (8 cm before laying the cable and 15 cm thick after laying the cable) in trenches including watering and consolidation, complete all as specified and directed. Note: Punned Thickness shall be measured and paid.
CA NO. GE AF NO.1 / GUR-42 / 2026-27 REPAIR/MAINT OF LT DISTRIBUTION NETWORK SYSTEM, LT UG CABLE, POLES PANELS, LT JOINTS FINDING OF FAULT LT PANELS, MCCB WITH ALLIED WORKS AT 13 BRD AF DOMESTIC UNDER GE (AF) GURGAON NO 01.
Excavation in trenches n.exc 1.5 mtr wide and n.exc 1.5 mtr in depth and getting out soft/loose soil complete all as specified and as directed for foundation of stay, laying of cable etc.