Loading…
Loading…
2,464 results • Best match
SPECIAL REPAIR/ REPLACEMENT OF PERIMETER SECURITY LIGHTS, STREET LIGHT POLES, UG CABLES, JUNCTION BOXES AND ALLIED WORKS UNDER GE, CLEMENT TOWN
Supply and laying dry river sand laid in trenches as cable cushioning and covering all as directed. Sand cushioning to under ground electric cable 8cm before laying and 15cm after laying the cable intrenches all as specified and directed
REPAIR/ REPLACEMENT OF LT CABLES, LT PANELS AND CONNECTED WORKS AT DOMESTIC AREA AT AF STATION JODHPUR
M&L for sand cushioning for XLPE cable with tibba sand (one layer of 80mm thickness before laying of cable and other layer of 150mm thickness after laying of cable) and punning down to 180mm thickness to provide a required cover complete all as specified and directed by the Engineer-in-Charge. Note:- Punned thickness shall only be measured and paid.
CA NO. CWE/HILLS/EWS/20 OF 2026-2027 PERIODIC MAINTENANCE/ REPAIR OF TRANSFORMERS AND CALIBRATION OF SWITCH GEARS, HT CABLE, HT DISTRIBUTION NETWORK AT GE 871 EWS
Material and labour for laying DWC (Double wall corrugated ) pipe conforming or IS 16205 (electric cable use) of nominal outer dia min 100 mm and suitable for 95 Sqmm HT Cable for laying electrical cables under trenches / under road/ wall complete all as specified and directed.
REPAIR AND REPLACEMENT OF STREET LIGHT, FLOOD LIGHT, HIGH MAST LIGHT, STREET LIGHT POLES, CABLE AND OTHER CONNECTED WORKS AT ZONE-II UNDER AGE(I) LANSDOWNE
Supply and laying cable protection old size bricks, common burnt clay sub class 'B' designation 75 for protection of UG cable laid in trenches with axis of the bricks perpendicular to the axis of the cable complete all as specified and directed.
Utility Electrical Poles shifting( 33/11KV) Work Phalodi (NH-15 ) TO Needer via Ahu Pachudi Nagaur Taranu Kuchaman ,Renewal Kaladera km 359/00 to 384/00
Add extra in item no. 11.1 to 11.4 for Laying Charges for cable through Manual Boggi by making pit at regular interval and repairing the pit after laying of cable with PCC/ Bitumin as required.
REPAIR AND MAINT REPLACEMENT OF LT ELECTRIC OVERHEAD UNDERGROUND NETWORK SYSTEM INCL ALLIED WORKS AT SECTOR B1 UNDER GE UTILITY AMBALA
Material and labour for sand cushioning to cable with a layer of sand 8 cm deep before laying the cable and 15 cms deep after laying the cable (punned down to 18 cms depth after laying and stretching of cable) complete all as specified & directed.