Loading…
Loading…
2,402 results • Best match
ARC for supply and installation of electrical items and services at PADC, Panipat
EXCAVATION OF EARTH FOR CABLE / PIPE LAYING FOR ELECTRICAL WORK Excavation of earth for cable trenches / laying of G.I. pipes for cable work in all types of soils including saturated soil upto a max. depth of 1.5 metres including shoring, strutting and bailing out of water (if necessary), backfilling and compacting in layers not exceeding 20 cm. thick to the finished ground level and disposal and dressing of excess earth within a lead of 50 metres all complete with labour and materials as per standards, drawings, specifications and directions of Engineer-in-charge.
SPL REPAIR /REPLACEMENT OF OVER HEAD ACSR CONDUCTOR WITH UG CABLE LT PANELS AND CONNECTED ITEMS OF STN HQ , HQ CWE DINJAN AND HQ CCE AREA UNDER GE DINJAN
Material and Labour in repair, dismantling the all cable from panel, poles, MCB Main DBs taking out the cable loop stretching out the cable, carrying out end termination with new lugs, proper thimbling, fixing the joint kits connecting back to the new/existing panel board by means of nuts, bolts & washers of any size any type complete all as speciied and directed.. Note: (The work includes necessary excavation to take out the loop,and laying the cable, putting proper cable protection bricks using the old retrived bricks and refill the area properly and spreading any surplus soil (ii) The cost of Al lugs, joint kit shall be measured and paid separately under relevant items of schedule
REPAIR/ REPLACEMENT OF HT UG CABLES, GOD, 11 KV HT OH LINE, 4 POLE STRUCTURE AND MAINT OF DISTRIBUTION TRANSFORMER, HT SWITCHGEARS AND OTHER CONNECTED WORKS AT MIL YOL STN UNDER GE(KH) YOL.
Material and labour for sand cushioning to under ground cables 8 cm thick before laying the cable and 15 cm thick after laying, stretching and testing the cable all as directed.
Addition and alteration of existing Electrical Installation for Upgradation as PWD Standard of Bijoygarh State General Hospital, South 24 Parganas_SITC of Air Conditioning System
Laying of cable as below, on existing Cable Tray and binding with suitable size GI wire. Up to 50 sqmm
Shifting of HT LT Line on probased raod from Kaithunipole to Sabarmati Colony Iron Bridge in Municipal Corporation Kota
P / L of Double wall corrugated HDPE pipe confirming to IS : 16205 P-24, Stiffness Class 750 N, Externally corrugated and having smooth surface inside with HDPE Coupler, Elbow, Tee at required Depth below the ground for laying cable of following Nominal Outer dia. MFR Test report from NABL accrediated is to be submitted.(Excavation of Earth & Back filling with compaction is to be Paid Extra)All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR.63 mm
Signalling work in connection with Provision of one additional goods shed line of 750M at Phephna station of BSB division & Provision of Multi section Digital axle counter in Berthing tracks & water logging track portions at BUI & PEP station of Varanasi division.
Laying of signalling cable ( 2 core to 12 core) in the trench as per cable route plan approved by railway and meggering of all main & tail cables. The cable laying includes laying of cable in trenches as per the technical specification attached.