Loading…
Loading…
2,408 results • Best match
work
Connection of the Cables as per new cables schedule of 63 MVA Transformer & its RTCC Panel at both ends and Control & Relay Panel, Cooling Fans, Marshalling Box etc using existing Cables including Laying of additional Control Cables (if required) making necessary holes in the Glands Plates or Box whereever required. Supply & fixing of cable Glands of appropriate size providing of Ferrules as per site/requirement and Termination and connection of all existing/new Control Cables at RTCC & Transformer end and C&R end as per standard practice & all other associated work as per Technical Specification 1 Job for each Transformer.
Signalling work in connection with provision of second goods shed common running line of 750M at Phariya station of BSB division.
Laying of signalling cable (2 core to 12 core) in the trench as per cable route plan approved by railway and meggering of all main & tail cables. The cable laying includes laying of cable in trenches as per the technical specification attached.
GE (N) P/T- 26 OF 26-27 PROVN OF 110 X GEYSERS FOR PBOR GOVT MD AND OTM ACCN OF HQ SOUTHERN COMMAND , SPL REPAIR TO CERTAIN E/M EQUIPMENT, PROVN OF HIGH MAST LIGHT WITH VALUABLE WAR TROPHY UNDER AGE E/M NORTH UNDER GE (NORTH) PUNE
Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for laying cables and getting out in hard/dense soil for laying cable/erecting poles all as specified and directed.
At KOJ: Balance Electrical work of KOJ station in connection with ABSS provision of Platform surfacing, development of circulating area, approach road and toilet in circulating area for passengers in the jurisdiction of SSE/W/FKM.
Excavation of cable trench for laying of cable with necessary cable protection is to be done as per direction of Railway Engineer.
PROVN OF TOILET BLOCK AT FOREIGN TRANING NODE FTN IN AUNDH MIL STN UNDER GE MH AND RH KHADKI
Supply, laying and testing cable XLPE Insulated , armoured heavy duty electric cable with aluminium conductor 1100 volts grade, cross sectional area 10 Sqmm 2 core all as specified and directed by Engineer in Charge
S&T works in connection with Extension of COP to Cover Entire Length of Platforms at Adilabad, Kinwat, Himaytanagar, Bhokar, Manwat Road, Selu, Partur, Rotegaon and Washim Stations over Nanded Division
Breaking o f metal/ t a r roa d a n d refilling after laying the cables a s p e r drawing no.SDO/CABLE LAYING/010. The surface of the road shall be concreted to match with the old surface. Per