Loading…
Loading…
2,363 results • Best match
LIGHT/2026-27/2614-19 DATED 11.06.2026 S.NO. 01
P / L of Double wall corrugated HDPE pipe confirming to IS : 16205 P-24, Stiffness Class 750 N, Externally corrugated and having smooth surface inside with HDPE Coupler, Elbow, Tee at required Depth below the ground for laying cable of following Nominal Outer dia. MFR Test report from NABL accrediated is to be submitted.(Excavation of Earth & Back filling with compaction is to be Paid Extra)All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR. 63 mm
as per tender documents
Laying of HDPE Pipe PE-80, PN-6, DN-160mm dia Pipe for laying of 33KV, 3x300Sq.mm, XLPE Cable with HDD (trenchless) method including cable laying.
A)Butibori-Augmentation of SSE(T)/Butibori store depot due to commissioning of 3rd and 4th line under the jurisdiction of ADEN South. B)Sewagram-Augmentation of SSE(T)/Sewagram store depot due to commissioning of 3rd and 4th line under the jurisdiction of ADEN South.
laying cable) to bring the original condition.
Signalling work in connection with Extension of shunting neck and converted into DN Goods loop line at Tilati station of Solapur Division.
400.00 route plan, 1.0 mt. deep and 300mm wide along side the track in normal soil/strata, conforming to distances as per cable route plan and refilling after cable laying. This work includes covering of cable laid to trench by loose soil for a layer of 50mm thickness after clearing of route, bushes etc. It shall be ensured that top of the cables laid is at a depth of 0.8 m or more. If it is less, then the width and depth shall be suitably increased and accordingly proportionate payment shall be made. In case depth of trench is not achievable due to site conditions, proportionate payment will be made as per procedure. The work shall be done as per extant practice on C.Rly & the instruction of Railway engineer at site. Drg No SK 805
SHIFTING OF LINES AT KUNTI NAALA ON REQUEST OF IRRIGATION DEPARTMENT UNDER DEPOSIT HEAD
LAYING OF AB CABLE OF SIZE 120 SQMM.
Network Upgradation and Wi-Fi implementation at NTPC Kudgi
Laying of UTP Cable in HDPE/PVC Pipes