Loading…
Loading…
2,361 results • Best match
MAINT AND REPAIRS REPLACEMENT OF US LIGHTS WITH ENERGY EFFICIENT LED LIGHT FITTINGS IN ZONE-I AREA UNDER GE (A) JAISALMER
Supply, laying and testing cable XLPE insulated ,screened ,PVC bedded, galvanized steel strip or wire armoured electric power cables (heavy duty) 1100 Volts grade with stranded aluminium condutor of size 6 sq mm 2 core complete all as specified and directed by Engineer-in-charge.
SPECIAL REPAIR OF EXISTING RING MAIN SYSTEM FOR WORKSHOP, FD REGT AND CONNECTED AREA AT NEW CANTT UNDER GE (WEST) PRAYAGRAJ.
M&L for dry river washed and screened dry sand for filling in trenches below and around the cable (8cm before laying & 15cm after laying of cable) for cushioning including punned down as specified in relevant clause of SSR Part I. 2010 complete all as specified and directed.
as per BoQ
Add Extra in item no. 11.1 to 11.4 for Laying Charges for cable through Vermeer machine by making pit at regular interval and repairing the pit after laying of cable with PCC/ Bitumin as required.
Development of office premises at 1st floor Gauridad - Rajkot
Supplying and Laying of power cable including lugs and glands and all sundry materials. Including excavation of trench minimum 900mm deep having bottom layer of sand then Laying pipe for cable and refilling trench with sand and top layer of brick as per details by engineer incharge, corecuts and any chasing in wall/RCC, clamping on and making it good.
REPAIR MAINT OF DG SETS DG SET PANEL EM EQPT AC REFRIGERATOR AND ALLIED WORKS AT PEDONG ALGARAH AP ALGARAH DALAPCHAND TEESTA TCP RHENOCK AND RONGLI UNDER GE 867 EWS
Supply and lay DWC Cable duct pipe of size 40 mm dia confirming to IS : 16205 part 24 for laying of LT cables etc complete with all accessories all as specified and directed.
SPL REPAIRS OTM ACCN BLDG NO T-28 OF SIKH REGIMENT AND SPL REPAIRS TO BLDG NO P-01 (1 TO 4) JCOs MD ACCN OF FD REGT AT DIPATOLI UNDER GE DIPATOLI
M & L for sand cushioning with a layer of sand 80 mm thick before laying of cable and 150 mm thick after laying of cable in trenches complete all as specified and directed.